Similar Projects
Blue Heron Mine 18 Sanitary - New Onsite Wastewater Disposal System
Alteration
Design
Oneida, TN 37841

2021 Supplemental Environmental - Sewer System Improvements
Infrastructure
Bidding
Westmoreland, TN 37186

Various Water and Sewer Maintenance Items
Term Contract
Bidding
Kingsport, TN

Lupton Drive Chronic SSO Elimination
Renovation
Post-Bid
Chattanooga, TN 37400

Design/Build Services to Repair/Replace the Sanitary Sewer System at the Jacobs Civilian Conservation Center
Post-Bid
$500,000 to $1,000,000 est. value
Bristol, TN

East Ridge Sewer Basin 3C and 4B Rehabilitation
Results
Chattanooga, TN

Sewer Pipe
Term Contract
Results
Chattanooga, TN 37402

Sprinkler System
Renovation
Construction
Clarksville, TN 37040

2020 CDBG II Sewer System Improvements
Infrastructure
Bidding
Dandridge, TN

Upper Station Camp Creek Sewer Extension
Post-Bid
Gallatin, TN

Sanitary Sewer Cured In Place Pipe Lining (CIPP) Blanket Contract
Results
Less than $2,000,000 est. value
Chattanooga, TN 37402

Construction Installation for the Water, Gas, and Wastewater Systems
Infrastructure
Bidding
Lenoir City, TN

Belinda City Lateral Lining
Post-Bid
TN 37122

Storm and Sanitary Sewer Revisions at Lupton City Mill
Results
Less than $598,589 est. value
Chattanooga, TN 37402

Sewer Relocation for the West Beaver Creek Drive
Post-Bid
$400,000 est. value
Knoxville, TN 37918

Reported 01/12/2022 12:00 AM
Project Title

Bowling Alley Force Main Installation

Physical Address View project details and contacts
City, State (County) New Johnsonville, TN   (Humphreys County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $70,000
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Installation of approximately 1,680 LF of 4 force main and appurtenances. The Contractor shall be responsible for all costs associated with the materials, equipment, and labor necessary to construct, and test all proposed items shown on the Drawings. Contractor shall also be responsible for the traffic control, worker protection, environmental pollution control, waste disposal and all other ancillary actions required to complete the Work

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents