Similar Projects
Holiday Hills Drainage Improvement Project
Infrastructure
Bidding
$1,374,023 est. value
Jasmine Estates, FL 34668

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

KCS NASA Causeway Shoreline Repairs
Term Contract
Post-Bid
$1,000,000 to $5,000,000 est. value

Main Avenue and 15th Street Intersection Drainage Improvements Project
Results
$89,120 est. value
Dade City, FL 33523

Howard Avenue Drainage Improvements - Phase II
Results
Less than $138,171 est. value
Dade City, FL 33525

As Needed Restoration of Stormwater Conveyance Systems
Infrastructure
Post-Bid
FL

As Needed Corrugated Polypropylene High Performance Storm Pipe – Multi-Year
Infrastructure
Results
New Port Richey, FL

Pompanic Street Paving and Draining Construction/Repair
Infrastructure
Results
San Antonio, FL 33576

Ongoing and As-Needed Fabric-Formed Concrete Revetment Mats
Term Contract, Infrastructure
Results
New Port Richey, FL

As Needed Class III Reinforced Concrete Pipe and Gaskets for Pipe Joints
Infrastructure
Results
New Port Richey, FL

Supply Riprap Erosion Control and Sidewalk Repair
Infrastructure
Results
Holiday, FL 34691

Storm Water Pipe Repair - Storm Water Pipe Rehabilitation and Inspection
Infrastructure
Results
$325,000 est. value

Stormwater Culvert Replacement Contract - Multi Year
Term Contract, Infrastructure
Results
FL

Seven Springs Wastewater Treatment Facility Reject Pond Improvements
Infrastructure
Results
$1,000,000 est. value
FL

As-Needed Pond Liner Replacement and Repairs
Infrastructure, Alteration
Results
Land O' Lakes, Spring Hill, Wesley Chapel, Zephyrhills, FL 34610

Last Updated 05/09/2022 08:06 AM
Project Title

Colonial Manor Drainage Improvement Project

Physical Address View project details and contacts
City, State (County) Elfers, FL 34680   (Pasco County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,983,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

To repair an existing 4-ft and 8-ft concrete multi-use path and associated drainage and other improvements The Work required for this Project involves, but is not limited to: • Furnishing and installation of: o 18” through and 60” pipes either Reinforced Concrete Pipe (RCP) or High- Performance Polypropylene (HP_PP) • Pipe Materials Requirements: o ALL pipes to be installed along the rights of way (ROW) corridor, which will be subject to vehicular traffic loads (example a travel road) shall be made of Reinforced Concrete Pipe (RCP) o ALL pipes installed along drainage easements corridor, not subject to vehicular traffic loads shall be made of Reinforced Concrete Pipe (RCP)or an Optional Material – High Performance Poly Propylene (HP-PP) o High-Capacity curb inlets, manholes and mitered end sections o Asphalt Surface and Road Base Materials o Sidewalks and/or Driveways o Sod o Root Barrier • This activity includes the applicable recommendations from a certified arborist for the root cut, pruning and installation of the root barrier in the required length and depth: 12”, 18” 24”, 36”, 48” and 60”.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents