Similar Projects
Fire Station No. 5 Drainage Improvements
Infrastructure
Bidding
$90,000 est. value
Plantation, FL 33324

96-Inch Cured-In-Place Pipe (CIPP) at Riviera Boulevard Project
Infrastructure
Bidding
Miramar, FL 33023

Monterra Lake Bank Stabilization
Post-Bid
Coral Springs, FL

Construction Management at Risk Services
Post-Bid
Hollywood, FL 33022

Port Everglades, South Jetty Rehabilitation 2020, Broward County, Florida
Results
$1,000,000 to $5,000,000 est. value
FL

Shore Protection Project, Segment II, Beach Renourishment 2020-2021, Broward County, Florida
Results
$20,000,000 to $30,000,000 est. value
FL

Drainage Improvements/Milling and Resurfacing/Sidewalk/Base Work - SW 64TH
Infrastructure
Bidding
$2,195,504 est. value
FL

45th Year CDBG Drainage Improvement Project Northwest 7th Avenue
Post-Bid
Less than $189,761 est. value
Hallandale, FL 33009

Interchange/Modification/Bridge Widening/Drainage Improvements/Milling and Resurfacing
Results
Less than $26,400,000 est. value
FL

Construction of WTP Lime Sludge Holding Ponds Sheet Piles
Term Contract
Post-Bid
$620,000 est. value
Hollywood, FL 33024

SBDD 2020 Fabric-Formed Erosion Protection
Results
Davie, Southwest Ranches, FL

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Sidewalk and Drainage Maintenance and Repair
Term Contract
Results
$525,000 est. value
Fort Lauderdale, FL 33301

KCS NASA Causeway Shoreline Repairs
Term Contract
Post-Bid
$1,000,000 to $5,000,000 est. value

Lake Bank Barrier Restoration Pembroke Lakes Golf Course
Results
Less than $65,000 est. value
Pembroke Pines, FL 33026

Last Updated 02/28/2022 12:25 PM
Project Title

CDBG 47th NW 8th Avenue Drainage Improvements

Physical Address View project details and contacts
City, State (County) Wilton Manors, FL 33311   (Broward County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project will include the installation of new drainage inlet structures, drainage piping, and exfiltration trench that will be interconnected to existing drainage infrastructure. This project is the last of 3 phases, which are designated within the design plans. The project limits include the public right of way for NW 26th Street between Powerline Road and NW 8th Avenue (Phase 3).

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents