Similar Projects
Shake Shack / Des Peres
New Construction, Infrastructure - 3,453 SF
Design
$1,000,000 CJ est. value
Des Peres, MO 63131

Fee Fee Road (Westport Plaza Drive to Schuetz Road)
New Construction, Infrastructure
Bidding
$1,452,746 CJ est. value
Maryland Heights, MO 63043

Fee Fee Road (Westport Plaza Drive to Schuetz Road)
New Construction, Infrastructure
Bidding
$1,452,746 CJ est. value
Maryland Heights, MO 63043

2022 and 2023 Citywide Sidewalk
Post-Bid
$969,502 est. value
Saint Louis, MO

Installation of a Walking Track
Infrastructure
Post-Bid
Overland, MO

Spanish Pond ADA Improvements
New Construction
Results
MO 63138

Repave Streetscape at Justice Center
Results
Ballwin, MO 63011

Exterior ADA Concrete Ramps and Main Entry Stairs
Infrastructure
Post-Bid
Kirkwood, Saint Louis, MO 63122

2020 CRS Pavement Rehabilitation
Infrastructure
Results
MO

Louisiana Calm Street
Infrastructure
Post-Bid
$108,487,725 est. value
Saint Louis, MO

University Drive , Grobman Road and North Campus West Drive Paving
Infrastructure
Results
Saint Louis, MO

On-Call Roadway Maintenance
Term Contract
Post-Bid
Town and Country, MO

Asphalt Repairs
Infrastructure - 9,212 SF
Results
Clayton, MO

Florissant Road Improvements
Infrastructure
Post-Bid
Ferguson, MO 63135

2021 Concrete Pavement Replacement
Infrastructure
Results
Creve Coeur, MO

Last Updated 01/10/2023 10:35 AM
Project Title

New Ballwin Road Improvements

Physical Address View project details and contacts
City, State (County) Ballwin, MO 63021   (Saint Louis County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $1,187,280 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Scope of Work includes street improvements to New Ballwin Road within the City of Ballwin and provides for pavement preparation, asphalt overlay, full depth concrete replacement, pavement striping, curb ramp replacement, curb and gutter replacement, concrete driveway approach replacement, street lighting, traffic control and other incidental items and work described in the Project Manual, or reasonably inferable therefrom. The City of Ballwin anticipates issuing notice to proceed in the spring of 2023. A bid security in the amount of five percent (5%) of the bid amount must accompany each bid, in accordance with the Instructions to Bidders. For a contractor to be awarded this project the contractor must have a fully responsive contractor questionnaire on file with the Missouri Highway and Transportation Commission at least 7 days prior to the bid opening date. All bidders must be on MoDOT's Qualified Contractor List per Section 102.2 of the 2021 Missouri Standard Specifications for Highway Construction. No Second Tier Subcontracting will be allowed. The wage rates applicable to this project have been predetermined as required by law and are set forth in this specification. When Federal wage rates are applicable and included, this contract is subject to the "Work Hours Act of 1962", (P.L. 87- 581: 76 Stat. 357) and implementing regulations. When state and federal wage rates are both required the higher of the two for each job classification shall be used. Upon signing the contract, the successful contractor and any subcontractor performing the work shall provide a ten-hour Occupational Safety and Health Administration (OSHA) construction safety program for their on-site employees within sixty (60) days of beginning work on the construction project. The City of Ballwin, Missouri hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, businesses owned and controlled by socially and economically disadvantaged individuals will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, religion, creed, sex, age, ancestry, or national origin in consideration for an award. The DBE Contract Goal for this project is 15%, and DBE firms must be certified by MoDOT to attain credit towards this contract goal. There is no On the Job Trainee goal. The Owner Intends to Award the Contract to the Lowest, Responsive, Responsible Bidder. The Owner Reserves the Right to Reject Any and All Bids, and to Waive Any Irregularities in the Best Interest of the Owner With Modot's Consent.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents