Similar Projects
Purchase of Water Meters on an Annual Contract
Bidding
Lawrenceville, GA

Installation, Replacement and/or Relocation of Gravity Sanitary Sewer Mains, Force Mains and Appurtenances - Installation, Replacement and/or Relocation of Pressurized Water Mains and Appurtenances
Post-Bid
Lawrenceville, GA 30042

Highway 138 Pressure Improvement Project
Post-Bid
Lawrenceville, GA 30046

Advanced Metering Infrastructure (AMI)
Results
Norcross, GA

South Berkeley Lake Road Water Main Replacement
Results
Less than $1,415,567 est. value
Lawrenceville, GA

Provision of Inspection and Repair Services for Fire Hydrants on an Annual Contract
Term Contract
Post-Bid
Lawrenceville, GA 30042

Purchase of Ductile Iron Pipe and Fittings on an Annual Contract
Term Contract
Results
GA

Polyethylene Pipe Replacement Project
Post-Bid
Lawrenceville, GA 30046

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Moreno Street Water Improvements
Results
Less than $587,315 est. value
Buford, GA 30518

Provision of Pump Repair Services for the Beaver Ruin Pump Station
Results
Lawrenceville, GA 30044

Replacement of Large Water Meters, 3" or Larger on an Annual Contract
Term Contract
Results
GA

Inspection and Exercising of Water and Sewer Valve
Term Contract
Results
Lawrenceville, GA 30046

Inspection and Exercising of Water and Sewer Valves on an Annual Contract
Term Contract
Results
Lawrenceville, GA 30046

Frontier Drive Water Main Replacement - Phase I
Results
Lawrenceville, GA 30046

Last Updated 03/31/2021 10:00 AM
Project Title

Force Main Replacement Phase 1

Physical Address View project details and contacts
City, State (County) Buford, GA 30518   (Gwinnett County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Furnishing all materials, labor, tools, equipment, and incidentals necessary for construction of the Force Main Replacement Phase 1 project. Project will consist of the installation of approximately 3,400 linear feet of 6-inch diameter and 2,600 linear feet of 8-inch diameter DR-11 DIPS high density polyethylene (HDPE) pipe force main and appurtenances to replace existing 6-inch and 8-inch cast iron force mains as well as rehabilitation of approximately 970 LF of existing 8-inch cast iron pipe force main by insertion of HDPE pipe.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents