Similar Projects
Last Updated 08/11/2021 06:24 AM
Project Title

Safety Improvements - US 76 (Sumter)

Physical Address View project details and contacts
City, State (County) SC   (Sumter County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Mobilization 1.000 Ls Bonds And Insurance 1.000 Ls Construction Stakes, Lines & Grades 1.000 Ea Traffic Control 1.000 Ls Cpm Progress Schedule 1.000 Ls Clearing & Grubbing Within Roadway 10.673 Acre Selected Clearing 50.513 Acre Removal & Disposal Of Existing Concrete 3.000 Cy Removal Of Exist. Guardrail 9,293.000 Lf Unclassified Excavation 1,397.000 Cy Borrow Excavation 13,911.000 Cy Excavation For Shoulder Paving 1,384.000 Sta Geogrid Reinforcement (Biaxial) 300.000 Sy Hauling Of Excavated Shoulder Material 1,384.000 Sta Maintenance Stone 325.000 Ton Hma Shoulder Widening Course 3,180.000 Ton Liquid Asphalt Binder Pg64-22 1,452.000 Ton Full Depth Asph. Pav. Patching 8" Unif 500.000 Sy Milling Existing Asphalt Pavement 2.0" 116,042.000 Sy Milling Existing Asphalt Pavement (Variable) 1,095.000 Sy Milled-In Rumble Strip 26.196 Mi Hot Mix Asphalt Intermediate Course Type b 11,905.000 Ton Hot Mix Asphalt Surface Course Type b 13,450.000 Ton Driveway Paving-Surface Type d 255.000 Ton 6" White Broken Lines -(Gaps Excluded)-Fast Dry Paint 32,440.000 Lf 6" White Solid Lines (Pvt. Edge Lines)-Fast Dry Paint 122,400.000 Lf 24" White Solid Lines (Stop/Diagonal Lines)-Fast Dry Paint 560.000 Lf White Single Arrow (Left, Straight, Right)-Fast Dry Paint 16.000 Ea White Word Message "Only"-Fast Dry Paint 12.000 Ea 6" Yellow Broken Lines(Gaps Exc) - Fast Dry Paint 1,960.000 Lf 6"Yellow Solid Line(Pvt.Edge&No Passing Zone)-Fast Dry Paint 113,520.000 Lf 24" Yellow Diagonal Lines - Fast Dry Paint 1,228.000 Lf 6" White Broken Lines(Gaps Excl.)Thermoplastic- 90 Mil. 8,110.000 Lf 6" White Solid Lines (Pvt. Edge Lines) Thermo.- 90 Mil. 30,600.000 Lf 24" White Solid Lines (Stop/Diag Lines)-Thermo.-125 Mil 140.000 Lf White Single Arrows (Lt, Strght, Rt) Thermo.-125 Mil. 4.000 Ea White Word Message "Only" -Thermoplastic - 125 Mil. 3.000 Ea 6" Yellow Broken Lines(Gaps Exc)Thermoplastic - 90 Mil. 490.000 Lf 6" Yellow Solid Lines(Pvt.Edge Lines) Thermo-90 Mil. 28,380.000 Lf 24" Yellow Solid Lines - Thermoplastic - 125 Mil. 307.000 Lf Permanent Clear Pavement Markers- Mono-Dir.- 4"x4" 1,168.000 Ea Permanent Yellow Pavement Markers Mono-Dir.- 4"x 4" Perm. Yel. 731.000 Ea Evaluation Of Pavement Marking Retroreflectivity 1.000 Ls Flat Sheet, Type Iii, Fixed Sz. & Msg. Sign 207.000 Sf u-Section Post For Sign Supports - 3p 418.000 Lf Removal Of u-Section Post 26.000 Ea Reflective Sign Post Panels 336.000 Lf Furnish & Instl No. 14 Copper Wire,1-Conductor For Loop Wire 4,800.000 Lf Sawcut For Loop Detector 3,500.000 Lf 12" Smooth Wall Pipe 4.000 Lf 15" Smooth Wall Pipe 4.000 Lf 18" Smooth Wall Pipe 202.000 Lf 24" Smooth Wall Pipe 20.000 Lf Cleaning Existing Pipe 500.000 Lf Drop Inlet Type 112 2.000 Ea Manhole With Standard 4' x 4' Box 1.000 Ea Cbt-9 Convert Junction Box 36" x 36" 26.000 Ea Rip-Rap (Class b) 582.000 Ton Geotextile For Erosion Control Under Riprap(Class 1)Type b 743.000 Sy Mt3 Leading End Treatment Tl3 29.000 Ea Mb Trailing End Treatment 17.000 Ea Mgs3 Gr Standard Shoulder 12,637.500 Lf Mgs3cs Gr Compressed Shoulder 3,900.000 Lf Mtbbc2 Mash Thrie-Beam Barrier Connector Tl2 16.000 Ea Permanent Cover 51.000 Acre Temporary Cover 25.500 Acre Fertilizer (Nitrogen) 5,100.000 Lb Fertilizer (Phosphoric Acid) 5,100.000 Lb Fertilizer (Potash) 5,100.000 Lb Agricultural Granular Lime 102,000.000 Lb Selective Watering 271,500.000 Gal Mowing 459.000 Acre Turf Reinforcement Matting (Trm) Type 1 40.000 Msy Temporary Erosion Control Blanket (Ecb) 19.946 Msy Hydraulic Erosion Control Product (Hecp) - Type 2 33.660 Acre Hydraulic Erosion Control Product (Hecp) - Type 4 17.340 Acre Sediment Tubes For Ditch Checks 4,004.000 Lf Silt Fence 28,625.000 Lf Replace/Repair Silt Fence 2,862.500 Lf Removal Of Silt Retained By Silt Fence 7,156.250 Lf Inlet Filter Cleaning 33.000 Ea Inlet Structure Filter - Type a 528.000 Lf Stabilized Construction Entrance 4,125.000 Sy

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents