Similar Projects
Southeast Wastewater Collection System Improvements - Phase IV
Infrastructure
Bidding
$10,277,640 CJ est. value
Las Cruces, NM 88001

Plumbing Services
Term Contract
Sub-Bidding
Artesia, NM 88210

Retrofit District Facilities with Automatic Faucets, Flushers and Bottle Fill Stations
Alteration
Post-Bid
Gallup, NM

On-Call Plumbing Services
Term Contract
Post-Bid
Bernalillo, NM

Mechanical, Electrical, and Plumbing Job Order Contract
Term Contract
Results
Clovis, NM

Plumbing - On-Demand Construction and Maintenance District Wide Services
Term Contract
Results
Gallup, NM

On-Call Plumbing Maintenance Repair Services
Alteration
Post-Bid
Portales, NM

Plumbing Maintenance and Repairs On-Call District 3
Term Contract
Results
Albuquerque, Belen, Bernalillo, Tijeras, NM 87109

Plumbing and HVAC Repair and Installation
Alteration
Post-Bid
Estancia, NM

Replace Residential Water Service Valves - Morgan Site
Renovation
Results
$25,781 CJ est. value
Gallup, NM 87301

Plumbing and Hvac Service District 2
Alteration
Post-Bid

Plastic Pipe
Term Contract
Post-Bid
Albuquerque, NM

Plumbing Services
Alteration
Post-Bid
Las Vegas, NM

Retrofit District Facilities with Automatic Faucets
Alteration
Post-Bid
Gallup, NM

On Call Plumbing Services
Alteration
Post-Bid
Alamogordo, NM

Last Updated 02/17/2023 06:03 PM
Project Title

Storage Pond Lining and Sludge Disposal

Physical Address View project details and contacts
City, State (County) Artesia, NM 88210   (Eddy County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $1,141,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

General Description and Location of Project:Lining of a 2-acre reuse storage pond at the City of Artesias Wastewater Treatment Plant. Work includes sludge and riprap removal, earthwork, and lining of an existing effluent storage pond with 60-mil textured HDPE liner. Other improvements include pond access road improvements, new multi-level outlet structure, and inlet piping replacement. The tabulation of bids will be considered by the City of Artesia at its next regular City Council meeting following the opening of bids, or at a later meeting, whichever is in the best interest of the City of Artesia. Bidder s attention is directed to the fact that a bid bond, performance/payment bonds, wage rate requirements (as stipulated by New Mexico Procurement Code), and the Subcontractors Fair Practices Act will be applicable in responding to this bid invitation and in effect for this project. There will not be a mandatory pre-bid meeting held for this project. This project is wholly or partially funded by the City of Artesia. All qualified bidders will receive consideration without regard to race, color, religion, sex, or national origin. Bidders on this work will be required to comply with the Presidents Executive Order No. 11246, as amended. project scope of work includes the following: 1. Removal and storage of the existing sludge withing the existing effluent storage pond. 2. Site earthwork and grading. 3. Installation of a new HDPE liner within the effluent storage pond. 4. New cast-in-place effluent outlet structure.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents