Similar Projects
Miro Corners Parking
New Construction
Conception
$665,468 est. value
Hollywood, FL 33314

Safety D/B Push Button for WWD Devices at Interstate Ramps
Bidding

Stunson Nature Trail - Planting Buffer and Viewing Platform
Bidding
Oakland Park, FL 33309

Widen/Resurface Exist Lanes/Sidewalk/Bicycle Lanes
Post-Bid
Less than $1,378,994 est. value
FL

Public Private Partnership Redevelopment Opportunity for the Hollywood Beach Culture and Community Center
New Construction - 20,000 SF
Post-Bid
Hollywood, FL 33019

Sidewalk Restoration Services
Term Contract
Results
Miramar, FL

CDBG Sidewalk Improvement Project
Results
Deerfield Beach, FL 33441

Trail Repairs - Miscellaneous Locations
Bidding
$100,000 est. value
Davie, FL

Sidewalk Restoration Services
Post-Bid
Miramar, FL 33025

Broward MPO Regional Complete Streets Initiative
Results
FL

Northwest 99th Avenue Sidewalk Replacement
Bidding
$125,000 est. value
Coral Springs, FL 33065

Construction Manager at Risk (CMAR) Sidewalks, Streetlights, Streetscape, Landscape, Trails and Other Public Projects
Post-Bid
Hallandale, FL

Northwest 33rd Street Sidewalk Replacement
Results
Less than $75,000 est. value
Coral Springs, FL 33065

Southeast 5th Avenue Crosswalk
Bidding
Dania Beach, FL

Sistrunk Parking Lot 19 Southeast Corner of Nw 6th Street and Nw 19th Avenue
Post-Bid
$15,000 est. value
Fort Lauderdale, FL

Last Updated 07/17/2020 10:35 AM
Project Title

Bill Keith Preserve Boardwalk Extension and Poured in Placed (PIP) Rubber Mulch

Physical Address View project details and contacts
City, State (County) Fort Lauderdale, FL 33312   (Broward County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $50,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project is located at 1720 SW 17th Street, Fort Lauderdale, Florida 33312. The work to be accomplished under this contract includes, but is not limited to, the demolition of enough mulch and soil removal to construct the Poured in Place (PIP) rubber surfacing compacted crushed stone base and frame and pour the concrete footers for the recycled lumber boardwalk extension. Upon completion of the rock base and concrete footers, pour the rubber cushion course, then the wearing course and construct the decking

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents