Similar Projects
Odiorne Point State Park Playground
New Construction
Bidding
Less than $200,000 est. value
Rye, NH 03870

Toilet Building 4 Renovations at Pawtuckaway State Park
Renovation
Bidding
Nottingham, NH 03290

Jules Bisson Park Playground Equipment
Post-Bid
Somersworth, NH

Synthetic Turf Field Projects
Post-Bid
Bedford, NH

Tennis Courts Renovation
Results
Durham, NH 03824

Design and Build Custom In-Cast Concrete Skatepark
New Construction - 20,000 SF
Results
Dover, NH

New Playground Equipment - Academy Avenue
Post-Bid
Less than $35,000 est. value
Hampton, NH

Preston Athletic Field and Higgins Track
Results
Bedford, NH 03110

2021 Valley Cemetery Maintenance Building and Civic Park Recreation Building Project
Post-Bid
Lebanon, NH

Preschool Playground at the Raymond High School
Results
Raymond, NH 03077

Improvement of a Section of The Conway Recreation Path
Post-Bid
Conway, NH 03860

Terrill Park Redevelopment - Phase I
Results
Concord, NH

Resurfacing High School Track
Post-Bid
Conway, NH

Remich Park Playground
Results
Littleton, NH 03561

Park Shelters
New Construction
Post-Bid
Dover, NH

Last Updated 06/21/2021 10:11 AM
Project Title

Blair Field Outfield Renovations 2021

Physical Address View project details and contacts
City, State (County) Hampton, NH 03842   (Rockingham County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Reinstall topsoil and laser grade the entire outfield. Remove chain-link fence. Strip loam and stock pile. Install 3,500 yards of sharp sand to elevate field by approximately 1 foot. Install 8” perforated pipe drain in 5’ wide by 2 1/2’ deep 1 1/2” stone trench with fabric on top layer. Perimeter drain runs from behind first base dugout around outfield to left field foul line. Install concrete catch basin with cast-iron grate in utility road near batting cage. Tie in with perimeter drain. Spread stockpiled loam over outfield area. Power rake all loam areas. Hydroseed all loam areas Re-grade, compact and install fresh layer of reclaimed asphalt on utility road to dugouts 100 yards.

Details

Park/Playground, New Construction.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents