Similar Projects
Highway 52 Transmission Main and Booster Station
Post-Bid
Moncks Corner, SC

Waste Water Treatment Plant Water Line Replacement
Post-Bid
Charleston, SC 29405

Force Main Replacement at Pump Station 112
Results
Summerville, SC 29483

Water and Sewer Fittings and Accessories
Results
SC

Low Battery Water and Sewer Main Replacement - Phase 1
Post-Bid
Charleston, SC 29401

Backflow Device Testing
Term Contract
Results
Anderson, Beaufort, Bennettsville, Camden, Charleston, Chester, Columbia, Conway, Darlington, Eastover, Florence, Fountain Inn, Gaffney, Georgetown, Graniteville, Greenville, Greer, Hartsville, Hodges, Laurens, Manning, Marion, Moncks Corner, Mullins, Newberry, North Charleston, Plum Branch, Summerville, Timmonsville, Union, Varnville, Wellford, West Columbia, SC 29172

2019 Water Distribution System Improvements
Post-Bid
Goose Creek, SC

Installation of CIPP in Robynwyn Subdivision
Results
Summerville, SC 29483

Industrial Services and Pipe Maintenance and Repairs
Term Contract
Post-Bid
Charleston, SC

Water Box and Lid
Results
SC

Peninsula Water Main Rehabilitation Phase 3
Post-Bid
Charleston, SC 29401

Utility Location Services for Dorchester County Water and Sewer (DCW and S)
Results
SC

Berkeley County Master Meter
Post-Bid
SC

Railroad Avenue Force Main Relocation
Results
Moncks Corner, SC 29461

PS001 Force Main Replacement Phase 1 and 2
Post-Bid
Goose Creek, SC 29445

Last Updated 12/07/2018 10:56 PM
Project Title

Pump Station 2 Force Main Replacement

Physical Address View project details and contacts
City, State (County) Summerville, SC 29483 (Berkeley, Dorchester Counties)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description A. Install 30"X24" MJ TEE (for by-pass connection of 30" FM) (TNEMEC lined) B. 2ea 30" Plug Valve W/VB C. 1ea 24" Plug Valve or Gate Valve W/VB (when by-pass is disconnected install 24" blind MJ plug on 24" plug valve) D. Inspect, clean and rehab 2 existing manholes (new raven liner and stop leaks or repair any other deficiencies) E. Inspect, clean and CIPP Line approx.. 60lf of 36" DIP between MH #'s 1-21 and 1-35 F. Demo existing 30" FM (2ea 90 degree bends and 230lf+/-) G. Install New 30" PVC Gravity (C905) 250lf+/- (see bedding and trench detail) (trench should be backfilled with select fill and compacted in 6" lifts to a density of 98% and last 36" should be flowable fill) H. Install 2 New 8' Diameter MH 2ea (8'diameter base only to except 30" PVC Gravity then reduce to standard 4' MH) (MH ring and covers shall be made of composite material and be DOT rated. see detail for recommend manufacturer) I. Install By-Pass Pumping System (See Plans For Details and Layout). Contractor responsible for system at all times. Provide two 4" sound attenuated bypass pumps appropriate for a residential area. J. Mill existing asphalt to a depth of 3" (6,460 sf +/-) K. Repave all areas disturbed to meet SCDOT Specifications (approx. 6,460 sf +/-) L. Remove and Replace 24"RCP storm drain (28lf) M. Install Silt Fence (900lf+/-) prior to construction. Maintain silt fence until ground is stabilized. N. Any vac truck needs will be the responsibility of the contractor O. All traffic control will be the responsibility of the contractor P. Contractor responsible for preparing record drawings of all new sewer construction. Manhole information to include rim elevations and inverts. Include South Carolina state plane coordinates of all manholes and valves. Q. CCTV video of the new construction by contractor. The video shall be provided to Dorchester County Water and Sewer for review. R. Work to follow all requirements of the SCDOT encroachment permit. a. Construction plans. b. Dorchester County Water and Sewer's Minimum Standards for the Design and Construction of Water and Sanitary Sewer Systems". c. Applicable SCDHEC regulations.
Details
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents