Similar Projects
Cemetery Road Drainage Improvement
Post-Bid
Worden, IL 62097

Country Lane Resurfacing and Culvert Replacement
Infrastructure
Post-Bid
Troy, IL 62294

Miner Park Judy's Branch Bank Stabilization
Results
Less than $29,010 est. value
Carbondale, Glen Carbon, IL 62034

Flood Repair at the Grey-s Farm Pump Station; Frontage Road a, West of i-255 and North of Horseshoe Lake Road
Results
Collinsville, IL 62234

Madison Avenue Drainage Improvements
Infrastructure
Post-Bid
Granite City, IL

Discharge Box Culvert Replacement at the Collinsville Pump Station
Infrastructure
Results
Collinsville, IL

Precoated Galvanized Corrugated Steel Pipe
Term Contract
Post-Bid
Edwardsville, IL

CCTV Inspection of Gravity Drains
Infrastructure
Results
Wood River, IL 62095

Relief Well Package #3 - Lower Wood River Drainage and Levee District
Term Contract, Alteration
Post-Bid
$5,000,000 to $10,000,000 est. value
IL

Pavement Reconstruction, New Sidewalks and Drainage Improvements on North Prairie Street from Corbin Street to Dorothy Street in Bethalto
Infrastructure
Results
Bethalto, IL

Engineering Services for Long Lake Outfall - Lake Drive Route
Infrastructure
Post-Bid
Edwardsville, IL

ARP Catch Basin Repairs Phase 1
Infrastructure
Results
Granite City, IL

Architectural/Engineering Services for Riverview Drive Reconstruction - Phase I
Infrastructure
Post-Bid
Alton, IL 62002

Bluebird Drainage Improvements
Infrastructure
Results
Granite City, IL

Williamson Drainage Improvements
Infrastructure
Post-Bid
$2,000,000 est. value
Williamson, IL

Last Updated 06/30/2022 12:47 AM
Project Title

Jefferson School Detention Project

Physical Address View project details and contacts
City, State (County) Collinsville, IL 62234   (Madison County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $350,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed improvement consists of the excavation of a detention pond, storm sewer and outlet structure, sanitary sewer relocation, riprap ditching, seeding, retaining wall and fencing.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents