Similar Projects
SB Fuels Multiple Award Task Order Contract (MATOC)
Design
Less than $349,000,000 est. value
Washington, DC

Rapid Disaster Infrastructure (RDI) #2
Design
Less than $99,000,000 est. value

LED Lighting
Post-Bid
Flint, MI 48504

Facility Repair & Renewal (FRR) (MATOC) Phase 1
Post-Bid
Less than $450,000,000 est. value
Washington, DC

Air Force Contract Augmentation Program (AFCAP) V
Results

Indefinite Delivery Indefinite Quantity (IDIQ), Multiple Award Task Order Contract (MATOC) for Design Bid Build Construction Services Within The Louisville Districts Area of Responsibility
Results
$45,000,000 est. value

GENERAL CONTRACTING SERVICES
Post-Bid

Indefinite Delivery Indefinite Quantity (IDIQ), Multiple Award Task Order Contract (MATOC) for Design/Build Construction Services within the Louisville Districts Area of Responsability
Results
Less than $45,000,000 est. value

Secure Construction SATOC
Post-Bid
$100,000,000 est. value
Washington, DC

Sources Sought Synopsis for United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Results
$3,000,000 to $15,000,000,000 est. value

Perry Innovation Center Boiler Stack and Standby Generator
Post-Bid
Grand Blanc, MI 48439

Facilities Maintenance-Multiple Award Task Order Contract (MATOC)
Results
Less than $24,900,000 est. value

Defense Health Agency - Medical Facility Operations and Maintenance
Post-Bid
$2,500 to $90,000,000 est. value

D/B Northeast MATOC
Results
$1,000,000 to $250,000,000 est. value

Custodial and Light Maintenance/Repair Services for the 2021-2022
Term Contract
Post-Bid
Flint, MI

Last Updated 02/16/2022 08:38 AM
Project Title

Electric Room Upgrade/Generator Installation

Physical Address View project details and contacts
City, State (County) Flint, MI 48503   (Genesee County)
Category(s) Government/Public, Single Trades
Sub-Category(s) Electric, Misc. Buildings
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Misc. Buildings, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Packaged Generator Assemblies, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents