Similar Projects
Waterfield Bldg. Ceiling Modernization Project
Infrastructure
Design
$1,000,000 to $5,000,000 est. value
Norfolk, VA

HVAC Replacement - Gatewood PEEP
Bidding
Newport News, VA 23601

Central Plant - Building 12 Cooling Tower 3 Replacement
Alteration
Bidding
$70,000 est. value
Virginia Beach, VA

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC and Mechanical Products
Term Contract
Post-Bid

Johnston Student Center HVAC Replacement at Virginia Tech
Results
Blacksburg, VA 24060

HVAC Services
Term Contract
Results
Salem, VA

Calcott ES HVAC Replacement Installation Only
Alteration
Bidding
$900,000 est. value
Norfolk, VA 23503

LINAC AHU Construction
Post-Bid
$400,000 to $1,500,000 est. value
Newport News, VA

Payne Hall HVAC Replacement - Phase 1
Renovation
Results
$200,000 to $299,999 est. value
Blacksburg, VA

HVAC Replacement - Dunbar Erwin Elementary School
Alteration
Bidding
$300,000 est. value
Newport News, VA 23607

EVMS Lewis Hall HVAC Modifications of Cast Lab
Term Contract
Post-Bid
Norfolk, VA

Replace HVAC, Bldg SP-366
Results
$500,000 to $1,000,000 est. value
Norfolk, VA

AIOS Rosemont Middle School HVAC Replacement - Installation Only
Alteration
Bidding
$900,000 est. value
Norfolk, VA

HVAC Upgrade at Acosta Building
Post-Bid
Norfolk, VA 23505

Last Updated 05/27/2022 11:47 AM
Project Title

GHS Cooling Tower Replacement

Physical Address View project details and contacts
City, State (County) Goochland, VA 23063   (Goochland County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Successful Bidder shall provide and furnish all labor, materials, tools, installation services and all other items necessary to fully and properly perform in a workmanlike manner in accordance with the standards required for this project. Successful Bidder Shall: Replace the existing two-cell cooling tower – BAC model #33707-2NMFW Serial #U000135601 with a new BAC two-cell model # XES3E-1222-10N-2 or equivalent Capacity – 3,250 GPM (1625 per cell) of water from 94° F to 84°F at 78° W.B. entering air wet bulb. Heat rejection required 16,243,500 Btu/hr, tower heat rejection capacity 17,894,858 Btu/hr, reserve capacity 10.16%. Tower pumping head required: 6.71 psi. Fan Motors – two 25HP fan motors (one per cell) Totally enclosed, fan-cooled (TEFC), Premium Efficiency Inverter Duty for 460V/60Hz/3Ph service. Refer to the attached specification 236500 for additional requirements

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents