Similar Projects
Dredging of the Kennebec River, Federal Navigation Project, Bath and Phippsburg, Maine
Infrastructure
Design
$5,000,000 CJ est. value
Phippsburg, ME 04562

Waterfront Improvements Phase I
Infrastructure
Design
$742,100 CJ est. value
Bowdoinham, ME 04008

Fisher Road Reconstruction
Infrastructure
Bidding
$140,000 CJ est. value
Bowdoinham, ME 04008

Fisher Road Reconstruction
Infrastructure
Bidding
$140,000 CJ est. value
Bowdoinham, ME 04008

Add Shoulder Aggregate to Existing Shoulders
Infrastructure
Post-Bid

Richmond Maintenance Facility Buildings
New Construction, Infrastructure - 4,000 SF
Post-Bid
$500,000 est. value
Richmond, ME 04357

On Call Milling Machines and Grinders
Results

On Call Maintenance Paving
Results

Mountain Road Reconstruction Project
Infrastructure
Bidding
$200,000 CJ est. value
West Bath, ME 04530

Crawford Drive Sidewalk and Road Improvements
Infrastructure
Post-Bid
$180,000 CJ est. value
Bath, ME 04530

(LCP) Light Capital Paving
Results
Less than $1,916,000 est. value
Brunswick, Cumberland, Durham, Gray, Lisbon, Mechanic Falls, Minot, Naples, New Gloucester, North Yarmouth, Poland, Raymond, Sebago, West Bath, Windham, ME

Green Street Rehabilitation
Infrastructure
Post-Bid
$1,668,000 CJ est. value
Bath, ME 04530

(LCP) Light Capital Paving
Results
Less than $1,831,000 est. value
Belgrade, Bowdoinham, Manchester, Mount Vernon, Readfield, Richmond, Rome, Sidney, Winthrop, ME

Pavement Milling and Ultra-Thin Bonded Wearing Course
Results
Brunswick, Topsham, ME

2021 Roadway Paving
Results
Richmond, ME

Last Updated 08/09/2022 03:34 PM
Project Title

Frank J Wood Bridge - Maine Department Of Transportation

Physical Address View project details and contacts
City, State (County) Topsham, ME 04086   (Sagadahoc County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Obtained from a credible source, Awaiting verification, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $17,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call to install interpretive panels at the new Frank J. Wood Bridge. The new bridge would provide safer bike lanes on both sides of the road as well as 6-foot sidewalks and make the passage through the towns. As of August 9, 2022, an engineer has been selected and this project is in the final planning phase. Bidding and construction could commence fourth quarter 2022. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents