Similar Projects
Necklace Phase One and Stream Restoration
Infrastructure
Bidding
Fairfax, VA

Schneider Branch Segment 1 (CU82-0002) at Sully Road Stream Restoration
Infrastructure
Bidding
VA

Philpott Landslide Construction/Repairs
Post-Bid
$5,000,000 to $10,000,000 est. value

Philpott Landslide Construction/Repairs
Post-Bid
$5,000,000 to $10,000,000 est. value

Piney Branch Stream Restoration - Construction
Results
Less than $1,600,000 est. value
Vienna, VA 22160

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Original Building Demolition and Box Culvert Construction
Construction
$6,075,000 est. value
Arlington, VA 22201

Reston Metro Center Walkway
Alteration
Construction
Reston, VA 20191

Corrugated Metal Pipe
Term Contract, Infrastructure
Bidding
VA

Spring 2021 Multiple Stream Restoration Projects
Post-Bid
$2,000,000 to $4,000,000 est. value
VA

Soil Erosion Control Services
Term Contract
Results
Lake Ridge, VA 22192

Blue Heron Landing Park
Renovation, Demolition, Infrastructure, Alteration
Bidding

Hdpe Pipe- Delivered- Loudoun
Term Contract, Infrastructure
Post-Bid
Aldie, Leesburg, Middleburg, Purcellville, VA 20105

Pohick Stream Valley Trail Hillside to Burke Station
Results
Less than $690,000 est. value
Fairfax, VA 22035

Pre-Qualification for Coon Branch at Annandale Park Stream Restoration(AC82-0002)
Infrastructure
Post-Bid
$2,000,000 to $4,000,000 est. value
Annandale, VA

Reported 04/02/2022 12:00 AM
Project Title

HDPE Double Wall Pipe

Physical Address View project details and contacts
City, State (County) (Arlington, Fairfax, Loudoun, Prince William Counties)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

To furnish and deliver of Solid wall High Density Polyethylene (HDPE) Round pipe that’s intent purpose is to line existing Culvert Pipe. Solid wall, smooth outer and smooth interior wall that conform to AASHTO M326 standards

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Pipe Culverts, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents