Similar Projects
NTP Vertical Turbine Pump Rebuild
Bidding
Brighton, CO 80603

Colorado City Artesian Well 4584-F
Bidding
Colorado City, CO

Water Right Due Diligence - Arkansas River Basin
Post-Bid
Denver, CO

Carmichael Park Vault
Post-Bid
Brighton, CO 80601

Repair by Replacing Domestic Water Pumps B420
Results
$1,000,000 to $5,000,000 est. value
Colorado Springs, CO

Six Denver Basin Aquifer Wells Drilling Project
Results
Denver, CO

Non-Potable Pond Pump Station
Construction
Brighton, CO 80601

MMAARS 6 Well Project
Bidding
Denver, CO

South Suburban Littleton Golf Course Well # 1
Post-Bid
Littleton, CO

EC, Provide Sump Pump and Controls
Results
Loveland, CO 80537

Directional Boring and Trenching
Bidding
Fort Collins, CO

On Call Alluvial Well Maintenance & Repair
Post-Bid
Castle Rock, CO

2020 Well Maintenance Project
Results
Less than $279,000 est. value
Aurora, CO 80016

2020 On Call Deep Well Repair
Post-Bid
Castle Rock, CO 80109

Bellvue Backwash Supply and Backwash Waste Pump Replacement Designs
Results
Greeley, CO 80512

Last Updated 12/12/2019 11:57 AM
Project Title

2019 Alluvial Well Improvements

Physical Address View project details and contacts
City, State (County) Commerce City, CO   (Adams County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $2,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project generally consists of the removal of electrical equipment, portions of interior ductile iron discharge piping, and pump control valves, followed by wellhouse upgrades that include installation of new pumps, flushing hydrants, new and existing motors, check valves, surge anticipation valves, tees, variable frequency drives, soft starters, HVAC upgrades, and higher capacity electrical service equipment. Work will also include testing, startup services, and miscellaneous upgrades to interior piping appurtenances.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents