Similar Projects
Southern Illinois University Carbondale - Communications Building Renovations & Additions
Addition, Demolition, Build-out, Infrastructure - 289,050 SF
Design
$84,000,000 CJ est. value
Carbondale, IL 62901

Bituminous Surface Treatment on Existing Roads and Parking Lots in Burning Star State Fish and Wildlife Area
Infrastructure
Bidding
$600,000 CJ est. value
Grand Tower, IL 62942

Bituminous Surface Treatment on Existing Roads and Parking Lots in Burning Star State Fish and Wildlife Area
Infrastructure
Bidding
$600,000 CJ est. value
Grand Tower, IL 62942

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

West Frankfort Mall Parking Lot Improvements
Infrastructure
Results
Carbondale, IL

Replace Campus Waterline
Infrastructure
Results
Less than $1,500,000 est. value
Carbondale, IL 62901

Deck Sealing on Various Bridges
Infrastructure
Bidding
$3,000,000 CJ est. value
Murphysboro, IL 62966

Road Impovements
Infrastructure
Post-Bid
IL

Illinois Avenue Streetscape Improvements - Phase 3; CIP No. SP0904
Infrastructure
Results
Carbondale, IL 62901

Pulliam Hall Exterior Stair Replacement
Infrastructure
Bidding
$187,000 CJ est. value
Carbondale, IL 62901

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

RR-21-4821 Pavement Repairs
Infrastructure
Results

RFQ - Various Phase I/II Projects, Various Routes, Various Counties
Term Contract
Post-Bid
$4,000,000 CJ est. value
Dixon, IL 61021

6 Miles of Resurfacing on IL 13 from Orchard Drive
Infrastructure
Results
Murphysboro, IL

Last Updated 04/13/2023 06:09 PM
Project Title

HMA Overlay, HMA Pavement Patching

Physical Address View project details and contacts
City, State (County) Carbondale, IL 62901   (Jackson County)
Category(s) Heavy and Highway, Outdoor Lighting, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Roadway Lighting, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $278,616 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

**As of April 13, 2023, this project has been awarded to E.T. Simonds Construction Company in the amount of $278,616.42. City/County : Carbondale Project consists of HMA overlay, concrete gutter removal and replacement, sidewalk removal and replacement in various locations, detectable warnings, and related appurtenances. Project Location: E Frontage Rd in The City of Carbondale Proposals requiring prequalification of bidders will be issued only to those contractors who are qualified with the Department of Transportation. Prequalification forms may be secured from the Engineer of Construction, Administration Building, 2300 South Dirksen Parkway, Springfield, IL 62764. ILDOT - HMA Overlay, HMA Pavement Patching 21-00145-00-RS

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents