Similar Projects
Managed Parking
Post-Bid
Green Mountain Falls, CO

2020 CDBG Prado Dr and Downtown ADA Improvements
Post-Bid
Fountain, CO 80817

Homestead Trail Project
Results
Less than $100,000 est. value
Colorado Springs, CO 80917

Ada Curb Ramp Retrofit Upgrades, including Removal of Sidewalk
Results
$1,000,000 to $5,000,000 est. value

Bus Stop Pad Replacement
Infrastructure
Post-Bid
Colorado Springs, CO

Upper Meadows Trail Project
Results
Less than $40,000 est. value
Colorado Springs, CO

Widefield ADA Improvements (CDBG) Project
Infrastructure
Post-Bid
CO

FCF ADA Improvements - Phase 1
Results
Less than $1,500,000 est. value
Colorado Springs, CO

Sidewalk and Drainage Improvements on El Monte Place
Infrastructure
Post-Bid
Manitou Springs, CO 80829

Old Broadmoor and Lake Roundabout Modification
Results
Colorado Springs, CO

Concrete and Asphalt Repairs at Timberview Middle School , Rockrimmon Elementary School and Pioneer Elementary School
Infrastructure
Post-Bid
Colorado Springs, CO 80919

Sidewalk Improvements on Canon and Park Avenue
Results
Manitou Springs, CO 80829

2021 CDBG Southmoor Drive ADA Sidewalk Improvements Project
Infrastructure
Post-Bid
Fountain, CO 80817

ADA Accessibility Improvements at the El Paso County Fairgrounds
Results
Less than $138,800 est. value
Calhan, CO 80808

Sand Creek Trail Crossing at Hancock
Infrastructure
Post-Bid
$650,000 to $850,000 est. value
Colorado Springs, CO 80902

Reported 04/29/2022 12:00 AM
Project Title

PikeRide Expansion Construction Project

Physical Address View project details and contacts
City, State (County) Colorado Springs, CO   (El Paso County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected May 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes pouring concrete pads where needed, ordering and installing the signs and racks. The scope has been set up with an ad-alt scenario, and the timeline is very flexible.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents