Similar Projects
Canterbury Drive/Elm Ridge Drive/Wood Drive/Woodland Drive - Willow Creek Subdivision, Phase II - Village Of Northbrook
Alteration
Conception
$4,375,701 est. value
Northbrook, IL

Replacement of Tank Mixer at Manchester Water Tower
Infrastructure
Design
$27,649 CJ est. value
Wheaton, IL 60187

Design Review - Greenleaf Street / Retail
Addition, Infrastructure - 1,840 SF
Design
$200,000 est. value
Evanston, IL 60202

Village Hall Equipment Garage Addition
Addition, Demolition, Infrastructure - 1,248 SF
Bidding
$2,000,000 CJ est. value
Addison, IL 60101

Drainage Improvements
Infrastructure
Bidding
$200,000 CJ est. value
Ogden, IL 61859

Replace Medium Intensity Taxiway Lights (MITL) on All Taxiways on the Airfield
Infrastructure
Sub-Bidding
$3,000,000 CJ est. value
Mount Vernon, IL 62864

City of Canton 360 East Linn Street Structural Demolition and Asbestos Removal
Term Contract, Demolition, Infrastructure
Sub-Bidding
$90,000 CJ est. value
Canton, IL 61520

Maine South HS Synthetic Turf Replacement
Post-Bid
Park Ridge, IL 60068

2021 Site Improvements at Multiple Schools
Post-Bid
IL

Lakeshore Drive Lift Station Replacement
Results
Decatur, IL 62521

DNR-Matthiessen State Park Leach Field Replacement
Results
Oglesby, IL

2021 Water Main Extensions - Contract A
Alteration
Construction
Sandoval, IL 62882

New Library Building and Site improvements
New Construction - 70,160 SF
Construction
$13,000,000 to $13,500,000 est. value
Galesburg, IL 61401

Teachers Village
New Construction, Renovation, Infrastructure - 20,000 SF
Pending Verification
$51,000,000 CJ est. value
Chicago, IL 60622

Removal and Replacement of Highway Light Poles, Luminaries and Breakaway Couplings
Infrastructure
Design
$500,000 CJ est. value
Altamont, TN 37301

Last Updated 07/25/2022 05:06 PM
Project Title

New Drinking Water Well - City of Woodstock

Physical Address View project details and contacts
City, State (County) Woodstock, IL 60098   (McHenry County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected January 2024
Bids Due View project details and contacts
Estimated Value $1,750,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

FY22/23 Project Description One of the City's wells has experienced a reduction in its pumping rate. Therefore, it will be necessary to drill a new well earlier than previously anticipated in the CIP budget, and funds have been moved up approximately three years to start the process of designing a new well and determining the appropriate new location for the well. The cost for drilling this new well are included in the Water & Sewer Capacity budget as it is necessary to add this well to accommodate community growth as well as fix an existing issue with the City's water system related to reduced pumping rates. Funds in FY22/23 are requested to work with an engineering consultant on a new well design and on selecting the most beneficial and appropriate location for the new well. FY23/24 Project Description Funds in the amount of $1,750,000 are requested in FY23/24 to complete project construction, which includes activities such as drilling a new well, installing pump equipment, and providing electrical power. If drilling the new well in close proximity to an existing well is not feasible, costs would increase due to the need to build a pipeline from the well to the nearest treatment facility. As of July 25, 2022, this project is included in the City of Woodstock's FY 2022-2032 Budget CIP and funding for construction is allocated for FY 23/24. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents