Similar Projects
Scour Repair Project
New Construction, Infrastructure
Bidding
$70,000 est. value

Bridge Deck Maintenance, Six NY Route 17 Bridges
New Construction, Infrastructure
Bidding
$9,000,000 est. value
Deposit, NY 13754

Sherman Creek Road over West Branch Delaware River Bridge and Pierce Creek Road over Pierce Creek Bridge Joint Reconstruction
Infrastructure
Post-Bid
Binghamton, NY

Replacement of Washington Drive Bridge Over Fuller Hollow Creek
Term Contract
Results
Vestal, NY 13850

Replacement of Rte. 11 Bridge Over I-81 With Construction of Roundabouts at on and Off Ramp Intersections
Results
Less than $18,300,000 est. value
Dickinson, NY 12930

North Sanford Road (CR 241) Bridge Over Oquaga Creek Bridge Replacement (3349630)
Results
Deposit, NY

Middle Stella Ireland Road Bridge (BIN 3349820) Wearing Surface Replacement
Results
Endwell, NY

Bridge Replacement: Route 8 Over East Branch Cold Spring
Results
Deposit, NY

Rehabilitation of Steel Arch Bridges Various Locations County of Broome State of New York
Results
Binghamton, NY

Statewide Emergency Bridge Contract Regions 1 - 10
Results

JOC Bridge Maintenance
Results

Miscellaneous Bridge - Stonework
New Construction
Results
Binghamton, NY

Bridge Scour Repairs at Two Locations on Route 7
New Construction
Results
$600,000 est. value
Conklin, NY

Bridge Replacement
New Construction, Infrastructure
Results

Structural
New Construction, Infrastructure
Results

Last Updated 02/28/2022 10:31 AM
Project Title

Meeker Road Bridge Rehabilitation Project

Physical Address View project details and contacts
City, State (County) Vestal, NY 13850   (Broome County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,025,685
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work site is in the Town of Vestal on Meeker Road over the Choconut Creek. The project limits extend from Glenwood Road to Main Street. The work includes providing all labor, materials, machinery, tools, equipment and other means of construction necessary and incidental to the completion of the work shown on the plans and described in these specifications including, but not necessarily limited to the following: Bridge rehabilitation including replacement bearings, HPIC concrete deck, steel bridge rail, transition rail and guide railing, structural steel repairs, structural steel painting, substructure repairs, paving and striping.

Details

Bridge, Renovation.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents