Similar Projects
Shoreline Storage Tunnel Project
Bidding
$213,500,000 est. value
Cleveland, OH

Zoar Levee System Repairs, Zoar, OH
Post-Bid
Zoar, OH

Lower Olentangy Tunnel
Post-Bid
Columbus, OH 43215

Western Campus Tunnel Removal and Presser Hall Bridge Rehabilitation
Results
Less than $1,435,000 est. value
Oxford, OH

Lockington Dam Right Wall Drain System and Concrete Repair Project
Results
Less than $2,614,347 est. value
Lockington, OH 45356

Cleveland Bulk Terminal Ore Conveyance Tunnel Extension Project - Phase B
Post-Bid
Cleveland, OH

Muskingum River Lock and Dam No. 7 Mcconnelsville Dam Replacement Design/Build
Results
Less than $7,300,000 est. value
McConnelsville, Minerva Park, OH 43229

Tainter Gate Parallel Shaft Speed Gear
Post-Bid
Delaware, OH 43015

Village of Crooksville Reservoirs No. 1 and No. 2 Dam Breach Project
Results
Less than $250,000 est. value
Crooksville, OH 43731

Youngstown Dam Removals Project
New Construction
Post-Bid
Youngstown, OH

Southeast Dam Package - Veto Lake Dam Rehabilitation Project
Results
Less than $3,201,879 est. value
Belpre, OH 45714

2020 Pedestrian Tunnel Maintenance
Renovation
Post-Bid
$540,000 est. value
Dublin, OH

Southeast Dam Package - Tycoon Lake Dam Rehabilitation Project
Results
Less than $3,201,879 est. value
Belpre, OH 45714

Hoover Dam Improvements- Part 1
Results
Less than $15,381,250 est. value
Columbus, OH

Statewide Dam Improvements CMAR
Results
Less than $17,930,000 est. value
Celina, Circleville, Lake Milton, Van Buren, OH

Last Updated 09/17/2020 02:05 PM
Project Title

Zoar Levee Repair

Physical Address View project details and contacts
City, State (County) Zoar, OH   (Tuscarawas County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,000,000 to $10,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The US Army Corps of Engineers, Huntington District intends to procure a contract for repairs to a levee system. The award of one (1) firm-fixed price construction contract is anticipated. This project is located in Tuscarawas County, OH. The levee surrounds the Village of Zoar, which is a National Historic Landmark. Zoar Levee is founded on pervious, glacial outwash soils, which has led to this and previous seepage related remediation work completed since the leveeā€™s construction in 1937. The work will consist of installing internal erosion interceptor trench, extending manholes, vibration monitoring, and the disposal of excess soils. Period of performance shall not exceed June 2022.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents