Similar Projects
HVAC Maintenance Services
Post-Bid
Arvada, Evergreen, Golden, Lakewood, Littleton, Wheat Ridge, CO

Infrastructure projects at the Southwest Memorial Hospital
Post-Bid
Cortez, CO 81321

Replace HVAC Primary Equipment, Main Building, Phase 1 of 3
Results
$1,100,000 to $1,200,000 est. value
Littleton, CO 80120

SB267 Replace HVAC System Building 49 and Replace Water Softeners Building 118 CMHIP Phases 1, 2, and 3 (Package 2 and 3)
Results
Less than $2,250,000 est. value
Sheridan, CO 80236

HVAC and Mechanical Products
Term Contract
Post-Bid

Heat Exchanger Tube Bundles
Results

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

CU Denver PN20-112394 - SCPP Only
Alteration
Results
$125,000 est. value
Denver, CO 80204

Refrigeration Maintenance and Service
Term Contract
Post-Bid
CO

LSC Replace HVAC Heating Zone Valves
Alteration
Results
$125,000 est. value

Hoods and Ducts
Term Contract
Post-Bid
Aurora, CO 80011

Wave Pool Mechanical Room Cooling for Central Recreation Center
Alteration
Results
$20,000 to $30,000 est. value
Aurora, CO 80013

B430 Cooling Tower Sump Pump Repair
Infrastructure
Post-Bid
Aurora, CO 81611

Heating and Plumbing Services
Term Contract, Alteration
Results
Littleton, CO

USAFA Fy22 Grease Laden Duct Cleaning Service
Term Contract
Post-Bid

Last Updated 02/16/2022 09:31 AM
Project Title

RFP 2020-078M19 Replacement HVAC Primary Equipment, Main Bld

Physical Address View project details and contacts
City, State (County) Littleton, CO   (Arapahoe County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $100,000 to $200,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of services will include assistance to the State during the process of assessment, design, construction, and warranty period. Specific tasks to be performed by the Construction Manager/General Contractor (CM/GC) include those generally performed by the CM/GC construction community where the Construction Manager is also the Contractor. A sample copy of the State’s CM/GC contract is contained within the RFP.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents