Similar Projects
Olympia Hills
New Construction, Infrastructure
Design
$2,000,000,000 CJ est. value
Herriman, UT 84096

Chrome Works
New Construction, Infrastructure
Design
$35,000,000 CJ est. value
Salt Lake City, UT 84101

2100 South Capacity Upgrade Project
Infrastructure, Build-out, Renovation
Bidding
$12,282,050 CJ est. value
Salt Lake City, UT 84111

3rd East Phase II - Marcus to Artesian Basin
Infrastructure
Bidding
$2,920,000 CJ est. value
Salt Lake City, UT 84111

Bueno Avenue Apartments
New Construction, Infrastructure
Post-Bid
$24,000,000 CJ est. value
Salt Lake City, UT 84102

Huntsman Mental Health Institute Utah Translational Research Facility
New Construction, Infrastructure - 185,000 SF
Post-Bid
$105,000,000 CJ est. value
Salt Lake City, UT 84108

Salt Lake International Airport Ga Zone 3 Corporate Hangar Site Development
Infrastructure
Results
$1,213,237 est. value
Salt Lake City, UT

SLCC OIT and Workforce Training Remodel and Relocation
Renovation
Results
$530,000 est. value
Salt Lake City, UT 84123

HEDCO Renovation and Upgrade Room 130
Renovation
Construction
Salt Lake City, UT 84112

Pura Vita Senior Housing
New Construction, Infrastructure
Construction
$6,000,000 CJ est. value
West Jordan, UT 84088

Thackeray Towns
New Construction, Infrastructure
Pending Verification
$15,000,000 CJ est. value
Sandy, UT 84070

South Main Street Apartments / Salt Lake City
New Construction, Infrastructure - 8,400 SF
Pending Verification
$150,000,000 CJ est. value
Salt Lake City, UT 84101

Brix
New Construction, Infrastructure
Design
$55,000,000 CJ est. value
Salt Lake City, UT 84101

RFQ Construction Manager - Division of Facilities Construction and Management (DFCM) Construction- University of Utah Health Sciences Campus Office Building
New Construction, Infrastructure
Bidding
$78,439,728 CJ est. value
Salt Lake City, UT 84132

SLCC Bruin Student Housing
New Construction
Post-Bid
$5,000,000 to $10,000,000 CJ est. value
Salt Lake City, UT 84123

Last Updated 05/01/2023 11:05 AM
Project Title

University of Utah (UU) Applied Sciences Building - Phase 3 - Bid Package 2

Physical Address View project details and contacts
City, State (County) Salt Lake City, UT 84112   (Salt Lake County)
Category(s) Education, Heavy and Highway
Sub-Category(s) College/University, Site Development
Contracting Method Competitive Bids
Project Status Construction Commenced, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $740,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of May 2023, this project is under construction Okland Construction Company, Inc., 1978 So. West Temple, Salt Lake City, UT 84115, Phone 801- 486-0144, hereinafter referred to as "Construction Manager", has been selected by DFCM, hereinafter referred to as "Owner", to be the Construction Manager / General Contractor for the construction of Uu applied sciences building, hereinafter referred to as the "Project. The Applied Sciences Building will be a renovation and expansion of the existing William Stewart Building located to the south of Presidents Circle between the Crocker Science Center and Pioneer Memorial Theatre. The renovation of the existing Stewart Building and the new addition to the west, will be the home of the Department of Physics & Astronomy and the Department of Atmospheric Sciences and include a variety of offices, instructional and research spaces. To support student success, the building will include state of the art classrooms, lecture halls, experimental laboratories, computer laboratories, student research laboratories, collaboration/ interaction spaces, an observatory, planetarium, community engagement facilities, along with meeting, office and support spaces. The scope of the project includes extensive renovation of the historic 40,000 square foot historic Stewart Building along with all new MEP and related systems, and a new 100,000 square foot east-to-west oriented wing on the west side of the Stewart Building. The work of this Phase 3 - Bid Package 2 is comprised of the bidding of the Reinforced Concrete Footings, Foundations, On-Grade-Slabs, Suspended Concrete Slabs, Beams, and Columns; Structural Steel, Steel Stairs and Railings; and Vertical Circulation all as shown on the Drawings and Specified herein. Questions are due on Wednesday, December 14, 2022 by 12:00 Noon MST and are to be emailed to Brock Randall at brock.randall@okland.com. *The value below reflects that of the overall project and not this particular package. *This project has been awarded and all trades have been let.

Details

,, 140,000 SF - 100,000 SF. 40,000 SF.
Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents