Similar Projects
Last Updated | 09/20/2021 04:11 AM |
Project Title | Fond du Lac Avenue (STH 145), Grantosa, Flagg / Florist Bridges; Fond du Lac Avenue (STH 145), Good Hope Road Interchange to 68th Street; Fond du Lac Avenue (STH 145), Good Hope Road to W. County Line; Various Bridge Locations, STH 145 / STH 175 / STH 181 |
Physical Address | View project details and contacts |
City, State (County) | Milwaukee, WI 53274 (Milwaukee County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Excavation Common, 3,813 CY; Borrow, 7 CY; Backfill Structure, 346 Ton; Base Aggregate Dense, 4,038 Ton; Concrete Pavement, 1,465 SY; Concrete Masonry Bridges, 760 CY; Bar Steel Reinforcement Coated, 179,370 Lbs; Marking Epoxy, 4,622 LF; Construction Staking, 67,859 LF; Construction Staking, 21 Each; Construction Staking, 10 LS; Conduit, 6,529 LF; Storm Sewer Pipe, 122 LF 12“, 21 LF 15“, 32 LF 18“, 4 LF 21“; Concrete Curb and Gutter, 16,762 LF; Concrete Sidewalk, 3,870 SF; Beam Guard, 1,942 LF; HMA Pavement, 55,726 Ton; Removing Asphaltic Surface Milling, 280,494 SY; Tack Coat, 26,782 Gals; Signs, 7,481 SF; Polymer Overlay, 10,565 SY. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |