Similar Projects
Ethel Hollow Phase I
Infrastructure
Bidding
$333,350 est. value
WV

Region 4 Northern AML Maintenance West Virginia
Alteration
Bidding
Charleston, WV

Mountain Valley Elementary School Renovations
Renovation
Post-Bid
Bluefield, Princeton, WV 24701

Williamson (Hight) Drainage and Portals
Infrastructure
Post-Bid
Charleston, WV

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Region 1 Northern AML Maintenance West Virginia
Term Contract
Bidding

Stormwater Pond 1 Diversion Project
Infrastructure
Post-Bid
Martinsburg, WV

Pike Island Monolith R33 and RR34 River Wall Crack Stabilization 2020
Results
$500,000 to $1,000,000 est. value
Wheeling, WV 26003

Construction of and Repairs to the Meadow River Rail Trail
Infrastructure
Bidding
Lewisburg, WV

Meadow River Trail FEMA Remediation Project
New Construction, Infrastructure
Post-Bid
Lewisburg, WV

Oak Grove Extension Drainage
Results
WV

Summersville Battle Run Waterline
Infrastructure
Post-Bid
$100,000 to $250,000 est. value
Summersville, WV 26651

Pioneer Trail Retaining Wall Site 5
Results
WV

Installation of a 36" Drain
Infrastructure
Post-Bid
Danville, WV

Last Updated 01/25/2022 03:51 PM
Project Title

Lower Mud River Levee Protection Project

Physical Address View project details and contacts
City, State (County) Milton, WV 25541   (Cabell County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Project Delayed, Bidding Expected second quarter 2022
Bids Due View project details and contacts
Estimated Value $25,000,000 to $100,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Construction will generally consist of: earthwork necessary to build an earthen levee approximately 8,300 linear feet in length, two pump stations capable of pumping approximately 60,000 – 90,000 gallons per minute, a gate closure necessary to maintain vehicular access through the levee, a sub-surface seepage barrier (i.e. soil-bentonite mix, or similar) with depths ranging from 25 to 65 feet, relocation of approximately 4,300 linear feet of the existing Mud River, a new raw water intake with low head weir for municipal water supply, natural gas fueled emergency power generators for the pump stations and raw water intake, construction of environmental habitat mitigation areas, demolition of existing structures, and land development needed to provide access roads and utilities needed to operate and maintain the project after construction.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents