Similar Projects
Bayou Saint John, Fairgrounds, Seventh Ward Group E (FRC)
Infrastructure
Bidding
New Orleans, LA

Manhattan Boulevard Widening (Northbound)
Infrastructure
Bidding
$700,000 est. value
Gretna, LA 70053

Downtown Loop Pavement Replacement Phase 2
Infrastructure
Post-Bid
New Orleans, LA

Construction of EV Shuttle Charging Station- Claiborne Parking Lot
New Construction, Infrastructure
Post-Bid
New Orleans, LA

LA 3139: Dickory Avenue - Orleans P/L
Infrastructure
Results
$2,500,000 to $5,000,000 est. value

LA 3152: Lane Modifications
Infrastructure
Results
$500,000 to $1,000,000 est. value
LA

Improvements to Causeway Boulevard and Scott Street Sewer Lift Station
New Construction, Infrastructure
Post-Bid
Gretna, LA

DPW RR077 Lake Vista Group E
Infrastructure
Results
New Orleans, LA

RR022 - Central City Group B (PMOPI)
Infrastructure
Post-Bid
New Orleans, LA

RR002- Audubon Group B (PMOPI)
Infrastructure
Results
New Orleans, LA

RR061 - Gentilly Woods Group F (FRCPI)
Infrastructure
Post-Bid
New Orleans, LA

Read Boulevard East Group E (FRC)
Infrastructure
Results
New Orleans, LA

RR097 - Leonidas Group B (PMOPC)
Infrastructure
Post-Bid
New Orleans, LA

Lower Ninth Ward Northwest Group C (FRC)
Infrastructure
Results
New Orleans, LA

Stuart Bradley Elementary School - Parking Lot Addition
Infrastructure
Post-Bid
New Orleans, LA

Last Updated 05/09/2022 02:42 AM
Project Title

RR215 Dillard Group A and B (PMOPI/FRC)

Physical Address View project details and contacts
City, State (County) New Orleans, LA   (Jefferson County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A. It is the intent of this project to install waterlines and remove and reconstruct the streets specified in the proposal. B. Removal and reconstruction work shall be accomplished in accordance with the construction documents and shall include but is not limited to the following: 1. Installing drainage, sewer and water main systems as shown on the plans. 2. Removing existing pavement and excavating to as shown on the plans. Hauling and legally disposing of existing pavement and surplus materials from the project site. 3. Constructing new concrete curbs or curbs and gutters. 4. Constructing asphalt pavement or Portland cement concrete pavement. 5. Replacing concrete sidewalks and driveway aprons. 6. Constructing concrete handicap ramps at locations shown on the plans. 7. Other work incidental to the project as shown on the plans. C. The Director reserves the right to reduce, delete or increase the quantity of any item in the proposal. P.No- 2019-RR215

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents