Similar Projects
Cerca Trova Mixed-Use Building
New Construction - 255,122 SF
Conception
$10,000,000 CJ est. value
Ann Arbor, MI 48104

Foundry Square
New Construction - 55,000 SF
Conception
$65,000,000 est. value
Muskegon, MI 49440

Student Focused 13 Story High-Rise
New Construction - 206,478 SF
Design
$10,000,000 CJ est. value
Ann Arbor, MI 48104

Washington Street Units and Retail
New Construction, Demolition - 255,216 SF
Design
$10,000,000 CJ est. value
Ann Arbor, MI 48103

Parking Structure Repairs 2020
Bidding
Lansing, MI

Construction of the East Lansing Parking Office and Maintenance Shop
Post-Bid
East Lansing, MI

Parking Structure 1, 2 and 5 - 2019 Renovations
Post-Bid
Detroit, MI

Multiple Buildings - Building Number 1009985 Parking Structure P1 to P4 Safety Measures Bidpack 01 - Construction
Results
Ann Arbor, MI

Wall Street West Parking Structure – Wall Street West Parking Structure
Results
Ann Arbor, MI

Beaumont Hospital Tower
New Construction, Renovation, Addition - 272,736 SF
Construction
$160,000,000 est. value
Farmington Hills, MI 48336

Main Street Office Building
New Construction - 50,000 SF
Construction
$20,000,000 est. value
Royal Oak, MI

Sugar Hill District Apartments
New Construction - 11,000 SF
Pending Verification
$36,600,000 est. value
Detroit, MI 48201

Temple Lofts
Renovation
Pending Verification
Lansing, MI

Market Avenue Apartments
Renovation - 210,000 SF
Conception
$26,100,000 est. value
Grand Rapids, MI 49503

City Tower Mixed Use
New Construction
Design
$55,000,000 est. value
Grand Rapids, MI 49503

Last Updated 02/28/2019 09:32 AM
Project Title

Parking Ramp Elevator Upgrades

Physical Address View project details and contacts
City, State (County) Flint, MI   (Genesee County)
Category(s) Heavy and Highway
Sub-Category(s) Parking Garage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description The work includes, but is not limited to: complete elevator replacement of three (3), selective collective hydraulic passenger elevators with dual jack rope hydraulic passenger elevators. Work includes, but is not limited to, rails, cabs, cab lighting, hoistway entrances, hallway lanterns, call buttons and pit ladder. Replacement of existing mechanical systems for elevator machine rooms, power connections, power and lighting circuits, and revision of Fire Alarm smoke detection systems. Concrete work includes installation of sump in elevator pit. Plumbing work includes PVC sump crock, submersible pump, sleeves, piping, and condensate piping. Mechanical work includes new heat pump units, condensers, piping and jackets, and condenser mounting frame. Architectural work consists of security fence enclosure, and pipe bollard.
Details
Division 14 - Conveying Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents