Similar Projects
2022 ADA Curb Ramp Replacement Program
Infrastructure
Bidding
$200,000 est. value
Lansdale, PA

Wissahickon High School - Parking Lot Repaving
Infrastructure
Bidding
$300,000 est. value
Ambler, PA 19002

ADA Curb Ramps
Infrastructure
Post-Bid
Stowe, PA

Heroes Park Improvements
Infrastructure
Post-Bid
$300,000 est. value
East Norriton, PA 19401

Parking Lot Repairs and Paving at Fort Washington, Jarrettown & Thomas Fitzwater Elementary School
Results
Dresher, Willow Grove, PA 19034

2021 ADA Curb Ramp Replacement Project
Results
$50,000 est. value
Hatfield, PA 19440

Ursinus College Main Street Pedestrian Improvements
New Construction
Construction
Collegeville, PA 19426

Church Street Road Restoration Project
Infrastructure
Bidding
$500,000 est. value
Royersford, PA 19468

2021 ADA Ramp Replacement Project
Results
Horsham, PA 19044

Old Arch Road Sidewalk Improvements
Infrastructure
Bidding
$80,000 est. value
East Norriton, PA

Construct New Parking Lot - Penn Wynne Elementary School
Results
$350,000 to $450,000 est. value
Wynnewood, PA 19096

2022 ADA Ramp Replacement Project
Infrastructure
Bidding
$200,000 est. value
Kulpsville, PA

Parking Lot Improvements Lot 18
Results
$155,000 est. value
Merion Stanton, PA

2021 Curb and Sidewalk Project
Results
Montgomeryville, PA 18936

2021 Concrete Curb and Sidewalk
Results
Fort Washington, PA

Last Updated 05/20/2022 04:22 AM
Project Title

2022 ADA Curb Ramp Replacement Project

Physical Address View project details and contacts
City, State (County) Hatfield, PA 19440   (Montgomery County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $175,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes the replacement of ADA curb ramps at the intersections of N. Main St. & E. School St., E. School St. & Forest Way, Forest Way & Orchard Lane, E. Lincoln Ave. at Liberty Bell Trail, E. Lincoln Ave. & E. Broad St., E. Broad St. & Market St., and E. Lincoln Ave. & Poplar St.. The project also includes installing a new curb and storm inlet at Forest Way & Orchard Lane, replacing the driveway apron at 11 Market St., removing two existing ADA curb ramps along E. Lincoln Ave., permanently eradicating one crosswalk, and replacing select concrete sidewalk areas and driveway apron.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents