Similar Projects
White Spring
New Construction
Conception
Winterville, NC

Mulberry Trace
New Construction
Conception
Greenville, NC 27858

Farrington Trace
New Construction - 102,718 SF
Design
Greenville, NC

Intersect East - Master Plan
New Construction, Renovation
Design
Greenville, NC

Cars & Beyond New Building
New Construction, Infrastructure
Bidding
Greenville, NC 27834

Wildwood Park Bridges & Boardwalks
Infrastructure
Bidding
$300,000 CJ est. value
Greenville, NC 27834

Replacement of 115 kV Transmission Structures along Circuit 11, 12, 16, and 17
Infrastructure
Sub-Bidding
$30,000 CJ est. value
Greenville, NC 27858

Y--Design/Build: Cape Lookout Residential Housing
New Construction - 4,000 SF
Post-Bid
$1,000,000 to $5,000,000 est. value

Bituminous Plant Mix Asphalt
Term Contract
Post-Bid

2021 Street Resurfacing Contract Project
Results
Greenville, NC

Milling, Strengthening, Resurfacing, Shoulder Reconstrcution and Widening of Various Secondary Roads
Results
NC

East Bend Trace
New Construction - 92,226 SF
Construction
$8,020,067 est. value
Greenville, NC 27858

Site Work and Renovations for the Pitt County Animal Shelter
Renovation
Construction
Greenville, NC 27858

Stantonsburg Road - Mixed Use
New Construction
Pending Verification
Greenville, NC 27834

Turnberry Trace
New Construction
Conception
Greenville, NC 27858

Last Updated 08/17/2022 10:34 AM
Project Title

Dickinson Avenue Apartment Complex

Physical Address View project details and contacts
City, State (County) Greenville, NC 27834   (Pitt County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Parking Garage, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Obtained from a credible source, Awaiting verification, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $57,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a 150 unit apartment complex and a 390 unit parking garage. As of May 10, 2022, this project is in the early planning stages, and is seeking approvals from the City of Greenville. A general contractor has been selected. A firm timeline has not been announced, however, construction is unlikely to begin prior to fourth quarter of 2022.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed. **This General Contractor/Developer always bids privately to a closed subcontractor list.

Details

Apartments, 150 Unit(s). Apartments, 390 Unit(s).
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Residential Equipment, Residential Appliances.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling.
Division 28 - Electronic Safety and Security, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents