Similar Projects
Culvert Pipe Replacement Units 22 and 30
Infrastructure
Bidding
Palm Bay, FL

I-95 on-Ramps - Add Left Turn Lane(s)/Milling and Resurfacing/Base Work/Drainage Improvements
Infrastructure
Bidding
$4,010,531 est. value
FL

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

KCS NASA Causeway Shoreline Repairs
Term Contract
Post-Bid
$1,000,000 to $5,000,000 est. value

Dredged Material Management Area BV-11 Construction
Results
$1,000,000 to $5,000,000 est. value
FL

Desilt and Video and Pipe Lining
Results
Less than $600,000 est. value

Gramling Park Drainage Improvements
Infrastructure
Post-Bid
$202,319 est. value
Melbourne, FL 32901

Drainage Repair
Results
Less than $300,000 est. value
FL

Grant Place Baffle Box
Infrastructure
Post-Bid
$464,231 est. value
Melbourne, FL

Culvert Pipe Replacement - Units 2, 3, 4, 43, and 47
Results
Less than $332,362 est. value
Palm Bay, FL 32907

Thrush Drive Baffle Box
Results
$579,460 est. value
Melbourne, FL 32935

Malabar Road Drainage Pipe Repairs
Results
Less than $500,000 est. value
Palm Bay, FL 32907

Culvert Pipe Replacement Unit 20
Results
Less than $318,920 est. value
Palm Bay, FL 32907

Drainage Outfall Repair
Results
Less than $250,000 est. value
FL

THS Basin Baffle Box Improvement
Results
Less than $282,000 est. value
Titusville, FL

Last Updated 01/26/2022 01:50 PM
Project Title

Culvert Pipe Replacement - Knecht Road and Northeast Area

Physical Address View project details and contacts
City, State (County) Palm Bay, FL 32905   (Brevard County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $451,669
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The removal, disposal, re-installation, and restoration of street crossings along Knecht Road and Northeast Area. Knecht Road has seven (7) drainage pipes, one (1) inlet top replacement and (1) sidewalk replacement. Northeast Area has twenty-one (21) drainage pipes, three (3) headwalls, three (3) mitered end sections, eleven (11) ditch bottom inlets and some minor remove and replace curb and gutter in the City of Palm Bay. The project shall include all incidentals required to complete the project such as utility relocations and coordination, material furnishings, and restoration work associated with the installation of the various pipes, such as Reinforced Concrete Pipes (RCP), Polypropylene (PPP) and Corrugated Aluminum pipes (CAP), modifications to inlet structures, curb, and gutter for these pipe crossings.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents