Similar Projects
Logan City School District HVAC Upgrades
Alteration
Bidding
Logan, UT 84321

Rooftop HVAC Unit Replacement
Alteration
Bidding
Saint George, UT

Parks and Recreation Building HVAC Upgrades
Post-Bid
Less than $497,592 est. value
Salt Lake City, UT 84104

Canyonlands Field Airport Upgrade to Terminal Building Roof Top Units
Post-Bid
Moab, UT 84532

HEB Southeast Tower Fume Hood Upgrade
Results
$1,521,698 est. value
Salt Lake City, UT 84112

HVAC Unit Replacement for Lakeview Academy
Results
Saratoga Springs, UT 84045

Kanab Center Foundation Venting
Post-Bid
Kanab, UT 84741

HVAC Upgrades in Filter Room
Results
$2,000,000 est. value
Salt Lake City, UT 84121

Fire Station Hot Water System Re-Pipe
Post-Bid
Riverton, UT 84065

HVAC Preventative Maintenance and Repair Services
Results
Salt Lake City, UT 84111

Weatherization Assistance Program
Post-Bid
Orem, UT 84097

South Valley Services - HVAC Remodel/Construction
Results
West Jordan, UT 84088

Department of Labor - Combustible Dust Chambers
Post-Bid
Sandy, UT

HVAC Modifications
Results
Monticello, UT 84535

Biology Building Fume Hood Upgrade
Post-Bid
Salt Lake City, UT 84112

Last Updated 11/17/2021 06:51 AM
Project Title

DFCM Construction-Pre Qualified Mechanical-Davis Tech College Main Building Controls Upgrades

Physical Address View project details and contacts
City, State (County) Kaysville, UT 84037   (Davis County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $571,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project addresses free cooling and economizer issues throughout the building. The condensers loop shall be cleaned, flushed and treated. AHU coils will be removed, cleaned and inspected. Condenser water control valves will be removed and replaced, as well as piping specialties at each coil. Outdoor air dampers and controls will be removed and replaced at AHU 10, 11 and 12. The Work consists of the following: The Work includes: a. Upgrade controls at 12 air handling units. b. Re-pipe indirect cooling coils at 12 air handling units. Clean and flush existing indirect coils and piping. c. Provide new relief air hoods, and outside air damper at AHU-11 and AHU12, refurbish evap cooling section at AHU-10. d. Re-program and re-balance indirect cooling loop.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents