Similar Projects
Primate Center Chilled Water Extension - GPC
Infrastructure
Bidding
$2,130,800 est. value
Madison, WI 53774

Getzen Street Watermain
Infrastructure
Bidding
Elkhorn, WI 53121

42-Inch Transmission Water Main Phase 2
Post-Bid
Less than $6,300,000 est. value
Racine, WI 53400

2021 Lateral Replacement
Post-Bid
Two Rivers, WI

2020 Utility Replacements
New Construction, Renovation
Results
Sturgeon Bay, WI 54235

County Line Road Sanitary Sewer and Water Main Conversion
Results
$1,800,000 to $2,100,000 est. value
Menomonee Falls, WI 53051

2021 Sanitary Sewer and Water Main Improvements
Infrastructure
Bidding
Baraboo, WI

Marathon Avenue Sewer, Water Main, and Street Construction
Post-Bid
Neenah, WI 54956

Division Street and Prospect Street Sanitary Sewer and Water Main Reconstruction
Results
Winneconne, WI 54986

Water Main Relay
Infrastructure
Bidding
$354,665 est. value
West Allis, WI

Bridge Deck Surface Rehabilitation, Cleaning and Epoxy Sealing
Post-Bid
Barron, WI

East 9th Street - Street and Utility Improvements
Results
Owen, WI 54460

Plamann Park Sewer and Water
Infrastructure
Bidding
Appleton, WI 54913

Greenwood Road Roadway Reconstruction
Post-Bid
Greenville, WI

Perry to Newman 36-Inch Transmission Water Main
Results
Less than $11,000,000 est. value
Racine, WI 53406

Last Updated 08/14/2021 03:07 AM
Project Title

2021 Water Service Replacements

Physical Address View project details and contacts
City, State (County) Milton, WI   (Rock County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $60,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed construction consists of replacement of utility owned water service lines between the water main in the street and the curb box in the terrace, sidewalk or driveway. Work includes excavation, service materials and installation, reconnection to private service line, abandonment of existing service lines, backfilling with granular materials, compaction, installation of sixteen inches of aggregate base, traffic control, turf restoration and other miscellaneous items of work.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents