Similar Projects
Upper Harbor Terminal Park Masterplan
New Construction, Infrastructure
Conception
$5,000,000 est. value
Minneapolis, MN

Upper Harbor Terminal Park Masterplan
New Construction, Infrastructure
Conception
$5,000,000 est. value
Minneapolis, MN

Crystal Community Center Parking Lot and Bassett Creek Dog Park
Infrastructure
Design
$2,079,215 CJ est. value
Crystal, MN 55422

Crystal Community Center Parking Lot and Bassett Creek Dog Park
Infrastructure
Design
$2,079,215 CJ est. value
Crystal, MN 55422

Re-bid: Hall Park Improvement Project
Infrastructure
Bidding
$445,000 CJ est. value
Minneapolis, MN 55411

Re-bid: Hall Park Improvement Project
Infrastructure
Bidding
$445,000 CJ est. value
Minneapolis, MN 55411

Lions Central Park Splash Pad
New Construction
Post-Bid
Rogers, MN 55374

Lions Central Park Splash Pad
New Construction
Post-Bid
Rogers, MN 55374

Bde Maka Ska Park Pavilion/Refectory
New Construction
Results
Minneapolis, MN 55408

2021 Rogers High School Artificial Field Turf and Track Replacement
Results
$1,925,000 est. value
Rogers, MN 55374

Quarter Lake West Apartments Phase I
New Construction
Construction
$224,000,000 est. value
Minneapolis, MN 55416

Eide Saw Mixed Use Building
New Construction - 8,222 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Minneapolis, MN 55413

Cornelia View Apartments
Infrastructure, Renovation
Pending Verification
$33,000,000 CJ est. value
Minneapolis, MN 55435

Sanctuary Lofts
New Construction, Infrastructure, Build-out
Pending Verification
$6,600,000 CJ est. value
Minneapolis, MN 55417

Signature Event Area - 2026 - City of Brooklyn Park
New Construction
Conception
Less than $29,042,500 est. value
Brooklyn Park, MN 55445

Last Updated 12/08/2022 03:02 PM
Project Title

Park Investment Plan - Park-23304 - City of Minnetonka

Physical Address View project details and contacts
City, State (County) Minnetonka, MN 55345   (Hennepin County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Misc. Recreational, Park/Playground, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $990,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This item provides for the scheduled improvements within the park system on a 30 year schedule and includes small benches, bike racks and other amenities in addition to the projects identified below. Staff has created a 30-year schedule guideline. 2023: Gro Tonka and Mini-Tonka Park playground equipment and safety surfacing replacement ($165,000) Linner and Junction Park tennis court reconstruction ($80,000) Engineered wood fiber installation at playgrounds ($15,000) 2024: Reich Park tennis court reconstruction ($55,000) Engineered wood fiber installation at playgrounds ($15,000) 2025 Groveland and Sunrise Ridge Park playground equipment and safety surfacing replacement ($180,000) Covington Park tennis court reconstruction ($55,000) Engineered wood fiber installation at playgrounds ($15,000) 2026: Glen Moor and Wilson Park playground equipment and safety surfacing replacement ($200,000) Engineered wood fiber installation at playgrounds ($15,000) 2027: Covington and Woodgate Park playground equipment and safety surfacing replacement ($180,000) Engineered wood fiber installation at playgrounds ($15,000) This project is included in the city's 2023-2027 Capital Improvement Plan (CIP). As of December 8, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 12 - Furnishings.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents