Similar Projects
Materials For Multiple Main Line Turnout Projects
Renovation
Bidding
Clifton Forge, Richmond, VA

Materials For Multiple Main Line Turnout Projects
Renovation
Bidding
Clifton Forge, Richmond, VA

Buckingham Branch Railroad Request for Bids Buckingham Division The Buckingham
Renovation
Post-Bid
Dillwyn, VA

Switch Ties for a Main Line Turnout Replacement
Renovation
Post-Bid
Dillwyn, VA 23936

Design-Build Tasks for Closeout of DCMP Phase 2
Results
Less than $6,000,000 est. value
Arlington, VA 22202

Ballston Mu-Metro Station Area Improvements
Results
Less than $7,835,100 est. value
VA

Potomac Yard Rail Station
New Construction
Construction
$130,000,000 to $213,700,000 est. value
Alexandria, VA

Cross Tie Upgrade Project
Renovation
Post-Bid
Richmond, VA

King George County Industrial Park Railroad Tie Replacement
Results
King George, VA 22485

Railroad Inspection, Maintenance & Repair
Post-Bid
Fort Eustis, VA

NNTC - Trackwork and Service Facilities
Results
Newport News, VA

Rail Maintenance On-Call Service
Term Contract
Post-Bid
Norfolk, VA 23510

NNTC - Station, Platform and Site Finishes P3 (UPC 109076)
Results
Newport News, VA

Material Bids for The Buckingham Branch Railroad
Renovation
Post-Bid
Dillwyn, VA 23936

Light Rail Track Work
Results
$300,000 est. value
Norfolk, VA 23504

Last Updated 02/12/2020 10:59 AM
Project Title

Construction Management Services for the Pentagon City Metrorail Station Second Elevator Project

Physical Address View project details and contacts
City, State (County) VA   (Arlington County)
Category(s) Transportation
Sub-Category(s) Railroad/Subway
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $950,749
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Provide full Construction Management services to Arlington County for the Pentagon City Metrorail Station Second Elevator project. The Contractor, herein referred to as the Construction Manager (CM), shall provide full construction management services (General, Pre-Construction Phase, Construction Phase and Closeout Phase) to ensure the Work is performed in conformity to the Construction Contract Plans, specifications, all applicable codes, regulations, and standards.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Entrances and Storefronts, Windows, Special Function Windows, Security Windows, Access Control Hardware, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Directories, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Protective Covers, Flagpoles, Pest Control Devices, Flags and Banners, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Art, Casework, Seating.
Division 14 - Conveying Equipment, Elevators.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Packaged Generator Assemblies, Engine Generators, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Site Lighting, Walkway Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems, Intercommunications and Program Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Tactile Warning Surfacing, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 41 - Material Processing and Handling Equipment, Conveyors.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents