Similar Projects
Gun Club Road Project
Infrastructure
Bidding
Denver, CO 80249

PMAA-2022-HPSF-Onsite Wastewater Treatment System
New Construction, Infrastructure
Bidding
CO

Transmission System Structure Rehabilitation
Post-Bid
Denver, CO 80229

High Point 66th and 67th Avenue Project
Infrastructure
Post-Bid
Denver, CO 80249

2021 Preventive and Critical Lining
Results
$3,500,000 to $3,900,000 est. value
Denver, CO 80202

High Point Possum Gully Sanitary Sewer
Results
Denver, CO

Public Improvements within Phase 2 of The Point Redevelopment Project
Construction

2021 Capital Improvements Project Point Repair and Cured-in-Place Pipe
Infrastructure
Post-Bid
Lakewood, CO

East 64th Avenue and Denali Street Infrastructure Project
Results
Denver, CO 80202

2021 Clean and Video Inspections of Pipelines Program
Term Contract
Post-Bid
Lakewood, CO

East 16th Avenue System, Phase 1
Results
$8,500,000 to $9,400,000 est. value
Denver, CO 80202

2022 Sewer Improvements
Infrastructure
Post-Bid
Denver, CO

R3 S6 Sand Trap Cleaning
Results
Denver, CO 80204

Tunnel Sewer Repairs
Results
Denver, CO

Kinston Residential Phase 1B Public Infrastructure
Results
$1,500,000 to $2,000,000 est. value

Last Updated 01/21/2022 10:09 AM
Project Title

First Creek Interceptor Segments 1B, 1C, and 1D Project

Physical Address View project details and contacts
City, State (County) Denver, CO 80238   (Denver County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work for this project is located within Aurora and the City & County of Denver. The Work includes, but is not limited to, the following 1. Approximately 21,300 linear feet of 42-inch diameter gravity interceptor sewer. 2. Approximately 2,000 linear feet of 12-inch diameter gravity interceptor sewer. 3. Approximately 160 linear feet of 36-inch diameter gravity interceptor sewer. 4. Six trenchless crossings. 5. Construction of a new 36-inch Parshall Flume metering facility. 6. Removal and abandonment of an existing Parshall Flume metering facility. 7. Groundwater dewatering 8. Bypass pumping for connection tie-in points

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents