Similar Projects
I-70 Highway Resurfacing from M.P. 75.46 to 81.68
Infrastructure
Bidding
$5,000,000 to $20,000,000 est. value
CO

Widening From 26' To 40', New Passing Lanes, Chain Up Area and Minor Horizontal/Vertical Adjustments
Infrastructure
Bidding
$20,000,000 est. value
CO

Airfield Paving Construction MATOC
Post-Bid
Less than $400,000,000 est. value

Civil Site Work IDIQ for Interior Region 8
Post-Bid
$25,000 to $500,000 est. value
Glendale, Yuma, AZ

CR 107 Re-Alignment
Term Contract
Results
Carbondale, CO

South Midland Avenue Improvements Project
Results
Glenwood Springs, CO 81601

Widening From 26' To 40', New Passing Lanes, Chain Up Area and Minor Horizontal/Vertical Adjustments
Infrastructure
Bidding
$20,000,000 est. value
CO

Construction of the Crack Sealing 2021
Post-Bid
Rifle, CO

Interstate 70, within Glenwood Canyon, with Project Limits from MP 117.0 to MP 125.0
Results
$1,000,000 to $5,000,000 est. value
CO

Widening From 26' To 40', New Passing Lanes, Chain Up Area and Minor Horizontal/Vertical Adjustments
Infrastructure
Bidding
$20,000,000 est. value
CO

Coal Ridge High School Paving Design Build
Infrastructure
Post-Bid
New Castle, CO 81647

Centerra Parcel 301 Public Infrastructure
Results
$1,000,000 to $1,500,000 est. value

Rifle Middle School Paving Design Build
Infrastructure
Post-Bid
Rifle, CO 81650

Kinston Residential Phase 1B Public Infrastructure
Results
$1,500,000 to $2,000,000 est. value

Rifle Gap State Parks Beach Road Rehabilitation
Infrastructure
Post-Bid
$270,000 est. value
Rifle, CO 81650

Last Updated 11/11/2021 11:20 AM
Project Title

Rio Grande Trail Asphalt Removal and Replacement Project

Physical Address View project details and contacts
City, State (County) Glenwood Springs, CO 81601   (Garfield County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor to complete asphalt removal and replacement for roughly 528 LF of the Rio Grande Trail near Emma Road in Pitkin County. Work will include asphalt removal and replacement, root control barrier installation, and associated traffic control.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents