Similar Projects
Kenwood Hills Water System Improvements- Construction - WL1903 - City of Broken Arrow
Renovation
Conception
$428,000 est. value
Broken Arrow, OK

South Aspen Avenue Mixed Use Project Development
New Construction, Infrastructure - 260,000 SF
Conception
$132,000,000 CJ est. value
Broken Arrow, OK 74011

Pavement Rehabilitation
Infrastructure
Design
$22,434,951 CJ est. value
Tulsa, OK 74110

I-44 - Utilities
Infrastructure
Design
$2,074,299 CJ est. value
Tulsa, OK 74145

Non-arterial Street Rehabilitation Maintenance Zone 7060
Infrastructure
Bidding
$200,000 CJ est. value
Tulsa, OK 74103

Stonebrooke Estates Bridge
Infrastructure
Bidding
$30,000 CJ est. value
Tulsa, OK 74103

Gathering Place for Tulsa East Bank - Phase II - Bid Package #2
Infrastructure
Sub-Bidding
$5,000,000 CJ est. value
Tulsa, OK 74114

Broken Arrow Public Schools Sr. High School Event Center - Audio Visual
New Construction, Infrastructure - 36,172,414 SF
Sub-Bidding
$61,000,000 CJ est. value
Broken Arrow, OK 74012

Commercial Inspection Facility
New Construction, Infrastructure - 300 SF
Post-Bid
$5,000,000 CJ est. value
Tulsa, OK 74115

FY '22 Water Pollution Control Capital Equipment Replacements
Alteration
Post-Bid
Tulsa, OK

Sidewalk and Curb Ramp Construction for CBDG / HUD Grant
Infrastructure
Results
$235,173 CJ est. value
Tulsa, OK 74103

Lynn Lane Wastewater Treatment Plant Disinfection Improvements
Renovation
Results
Broken Arrow, OK 74012

AEP Laydown Yard Expansion Project
Infrastructure - 424,274 SF
Construction
$38,982,295 CJ est. value
Tulsa, OK 74108

WeConnect Office Expansion
Demolition, Renovation, Infrastructure - 866 SF
Pending Verification
$40,000 CJ est. value
Tulsa, OK 74137

The Enclave at Southern Trails
New Construction, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Broken Arrow, OK 74011

Last Updated 10/19/2022 11:33 PM
Project Title

Adams Creek Basin Study - City of Marianna

Physical Address View project details and contacts
City, State (County) Broken Arrow, OK 74012   (Tulsa County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $1,415,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of February 21, 2022, an engineer has been selected for the project. A firm timeline for construction has not been disclosed. *The previous solicitation is listed below for reference The professional services contract is for conducting a study examining the feasibility of a third wastewater treatment plant in Broken Arrow, in the Adams Creek Sub basin. The study will include but not be limited to: possible site/effluent discharge locations, examination of existing or development of new Total Maximum Daily Load (TMDL) report on discharge streams, investigation/development of preliminary discharge permit (NPDES), treatment technologies to achieve required effluent quality, cost estimation of plant and collection system improvements required based on proposed location of the Wastewater Treatment Plant, etc. The study will also include examining other potential options besides a wastewater plant for optimization of conveyance and collection of wastewater in this system. Pre-Bid Meeting Info: A firm representative will be required to attend a mandatory virtual pre-proposal meeting if a response to the letter of intent is submitted.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents