Similar Projects
Utilities
Infrastructure
Conception
$81,370 CJ est. value
Ada, OK 74820

Pavement Rehabilitation - SH 1
Infrastructure
Design
$1,500,000 CJ est. value
Ada, OK 74820

ICDBG Sulphur Youth Activity Center
New Construction, Infrastructure
Bidding
$3,500,000 CJ est. value
Ada, OK 74820

Construction of a 40' x 60' x 14' sheet metal building for Homer VFD
New Construction, Infrastructure
Bidding
$200,000 CJ est. value
Ada, OK 74820

Overlay Road Project for Three (3) Miles on Thomas Ranch Road (Pontotoc County District #1
Infrastructure
Post-Bid
$850,000 CJ est. value
Ada, OK 74820

Irving Center Exercise Pad and Walking Trail
Infrastructure
Post-Bid
$80,000 CJ est. value
Ada, OK 74820

Water Line Improvements
Infrastructure
Results
$1,453,390 CJ est. value
Francis, OK 74844

Early Site Package for a Future Elementary School
Infrastructure
Results
$878,894 CJ est. value
Ada, OK 74820

Hayes School Replacement - 2021 Bond - Ada City School District
New Construction, Infrastructure
Pending Verification
$37,000,000 CJ est. value
Ada, OK 74820

New Structure on North End of Property
New Construction, Infrastructure
Post-Bid
$700,000 CJ est. value
Ada, OK 74820

2022 CDBG-CR Community Center
New Construction, Infrastructure
Results
$543,000 CJ est. value
Francis, OK 74844

Parking Expansion Ada Readiness Center
Infrastructure
Post-Bid
$1,761,705 CJ est. value
Ada, OK 74820

Pavement Rehabilitation (A.C. And P.C.) Cleet Facility
Infrastructure
Results
$3,999,333 CJ est. value
Ada, OK 74820

Kiwanis Save the Train
Infrastructure, Renovation
Post-Bid
$200,000 CJ est. value
Ada, OK 74820

Water and Sewer Line Construction to Serve Take 5 Oil Change
Infrastructure
Results
$131,700 CJ est. value
Ada, OK 74820

Last Updated 07/12/2023 03:12 PM
Project Title

Chickasaw Nation Child Development Center

Physical Address View project details and contacts
City, State (County) Ada, OK 74820   (Pontotoc County)
Category(s) Commercial, Education, Heavy and Highway
Sub-Category(s) Pre-School/Daycare, Site Development, Warehouse/Storage
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $10,889,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

B. Description: New 18,000+ Square Foot, Pre-Engineered Metal Building with stone, EIFS and metal panel veneers, insulated concrete formwork storm shelters, drywall assemblies, finishes, mechanical, electrical and plumbing; sitework, site utilities and parking / paving, landscaping. C. Location: 17290 County Road 3570 Ada, Oklahoma 74820 D. Bids For: General Contracting One contract will be awarded for all Work as defined in the Contract Documents. C. General Contractors are required to prequalify to the approval of the Owner, no later than Ten (10) days before submission of bids if they have not previously bid on a project for the Owner within previous 12 months from bid date. Utilize AIA Form A305 - Contractor's Qualification Statement. D. Bidders will be required to provide Bid security in the form of a Bid Bond in the amount of five (5) percent of the bid amount. Refer to Document 00 4313 - Bid Security Form for additional information. E. Refer to other bidding requirements described in Document 00 2113 - Instructions to Bidders and modifications thereto and Document 00 2218 - Additional Instructions to Bidders. F. Submit Bid on the Bid Form provided by Office of the Architect. G. Bid shall be required to be submitted under a condition of irrevocability for a period of 45 days after submission. H. The Owner reserves the right to waive any informalities and accept or reject any or all bids. I. The word "Owner" as used in the Contract Documents means and denotes the Chickasaw Nation, Ada, Oklahoma and the obligations and liability shall be solely and exclusively that of The Chickasaw Nation, Ada, Oklahoma. As of July 12, 2023, a general contractor has been awarded. Construction is expected to start September 2023. *This project has been awarded and all trades have been let.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Parking Control Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents