Similar Projects
Traffic Signal Replacement
Infrastructure
Conception
$250,000 CJ est. value
Faribault, MN 55021

I-35/ TH 19 /CSAH 46/CR 59 Roundabout - Rice County
Infrastructure
Conception
$3,500,000 CJ est. value
Webster Township, MN 55057

East View Drive / 1st Avenue North West Street Extension and Regional Pond Construction
Infrastructure
Bidding
$600,000 CJ est. value
Faribault, MN 55021

East View Drive / 1st Avenue North West Street Extension and Regional Pond Construction
Infrastructure
Bidding
$600,000 CJ est. value
Faribault, MN 55021

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Road Right-of-Way Maintenance Equipment
Infrastructure
Post-Bid

2021 Reclamation and Overlay
Results
$3,044,917 est. value
Northfield, MN 55057

Highway Department Building - Drainage and Pavement Improvements
Results
$232,581 est. value
Faribault, MN 55021

Faribault Apartments
New Construction, Infrastructure
Pending Verification
$72,000,000 CJ est. value
Faribault, MN 55021

4th Street Storage Facility and Apartment Building
Addition, New Construction, Infrastructure - 9,050 SF
Pending Verification
$21,000,000 CJ est. value
Faribault, MN 55021

CSAH 76 - CSAH 8 to CSAH 1 (2.3 miles) - Rice County
Infrastructure
Conception
$5,100,000 CJ est. value
Richland Township, MN 55021

Bluff View Street and Utility Improvements
Infrastructure
Post-Bid
Northfield, MN

2021 Street Reconstruction Improvements
Results
$1,205,000 est. value
Faribault, MN

CR 101 (0.5 miles) - Rice County
Infrastructure
Conception
$800,000 CJ est. value
Webster Township, MN 55057

Concrete; Paving, Slabs and Repair
Infrastructure
Post-Bid
$50,000 to $150,000 est. value

Last Updated 09/22/2022 10:24 AM
Project Title

Chappuis Trail and Chappuis Court Subgrade Preparation, Resurfacing, and Shouldering

Physical Address View project details and contacts
City, State (County) Faribault, MN 55021   (Rice County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $247,499 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Furnishing All Work and Materials for: Chappuis Trail & Chappuis Ct. Subgrade Prep, Resurfacing, & Shouldering the Work Includes Approximate Quantities of Major Items as Follows: Mobilization 1 Ls Subgrade Prep 20' Width 50 Rs Class 5 Aggregate 2" 1500 Tn Class 7 Shouldering 1' Wide 10,084 Lf Bituminous Base Course 2" ("B" Oil May Be Used) 10,515 Sy Bituminous Wear Course 1 1/2" ("B" Oil May Be Used) 10,515 Sy Core Samples as Directed 6 Ea All Work Is to Be Done in Accordance With the Mn Dot Standard Specifications for Construction - 2018 Edition. A Payment and Performance Bond Will Be Required When Awarded. The Township Reserves the Right to Reject Any or All Bids and to Waive Any Informalities or Irregularities. No Bidder May Withdraw Their Bid for a Period of 30 Days. Finishing Date for Completion Is Set for September 20, 2022. Because Time Is of the Essence, a $500 Per Calendar Day Will Be Charged for Failure to Complete the Project on Time. Please Call (507-838-5336) With Any Questions. The Township Reserves the Right to Increase or Decrease Quantities as Necessary Without a Change in Unit Price. Edge Milling of Existing Driveways and Road Connections Will Be Required as Incidental Work.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents