Similar Projects
Spencer Street Redevelopment
New Construction - 107,900 SF
Conception
$10,000,000 CJ est. value
Lebanon, NH

Penacook Landing Phase II
New Construction
Conception
Concord, NH 03303

Market & Main Bedford
New Construction - 356,050 SF
Design
$70,000,000 est. value
Bedford, NH 03110

Sebbins Brook Crossing
New Construction
Design
Bedford, NH 03110

Whittier Street Sidewalk Improvements
Bidding
Dover, NH

Site Improvements and MOV Canopy Construction
Infrastructure
Bidding
$960,000 est. value
Hillsboro, NH 03244

Office Building and Residential Units
New Construction - 2,950 SF
Post-Bid
Merrimack, NH 03054

River Turn Woods
New Construction - 50,476 SF
Post-Bid
Conway, NH 03860

Dolly Copp Construction Phase III
Results
$500,000 to $1,000,000 est. value
Gorham, NH

Parking Lot Project
Results
Hampstead, NH

Altaria Apartments
New Construction - 845,560 SF
Construction
Lebanon, NH 03755

Arbor View Expansion
New Construction - 106,452 SF
Construction
Portsmouth, NH 03870

Cross Farm Elderly Housing Development
New Construction
Pending Verification
Londonderry, NH 03053

Cross Farm Elderly Housing Development
New Construction
Pending Verification
Londonderry, NH 03053

Manchester Mills
New Construction, Demolition - 390,933 SF
Conception
Manchester, NH 03101

Last Updated 02/17/2022 01:42 PM
Project Title

Keene Housing Site Improvements - Multiple Locations

Physical Address View project details and contacts
City, State (County) Keene, NH   (Cheshire County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Sidewalks/Parking Lot, Site Development
Contracting Method
Project Status Construction Commenced June 2021, Construction Completion Expected September 2022, No Sub Bids Needed
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The removal and replacement of identified asphalt, brick and concrete walkways inclusive of reinstatement of all disturbed lawns; the replacement of precast stairs and metal railings through out all four properties; the concrete sealing of one handicapped ramp located at 17 Roxbury Court.

Details

Apartments/Condominiums, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation, Demolition, Selective Site Demolition, Paving Removal.
Division 03 - Concrete, Precast Structural Concrete, Precast Concrete Stairs.
Division 05 - Metals, Metal Railings.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Unit Paving, Brick Unit Paving, Asphalt Unit Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents