Similar Projects
Pre-Qualified Contractors for Construction - Related - SOJO
Infrastructure
Bidding
South Jordan, UT

Segmented Pipe Liner
Term Contract
Post-Bid
UT

UDOT Pavement and Approach Slab Stabilization and Lifting AVL
Term Contract, Infrastructure
Post-Bid

Cottonwood Heights Recreation Improvements Project
Results
Cottonwood Heights, UT 84121

I-80; Culvert Rehabilitation
Results
$1,277,955 est. value

Uintah Indian Irrigation Project
Term Contract
Post-Bid
$471,000 est. value

Local Strees Reconstruction 2021 #1
Results
Less than $2,383,000 est. value
Salt Lake City, UT

Stormwater Inlet Grate
Infrastructure
Post-Bid
Riverton, UT

2021 Trails Shoulder Maintenance
Results
Draper, UT

Roundabout 1300 East and Pioneer Road
Infrastructure
Post-Bid
Draper, UT 84020

Complex MS4 Project
Term Contract
Results
Taylorsville, UT 84129

2022 CIPP Rehabilitation Project
Infrastructure
Post-Bid
$500,000 est. value
Bluffdale, UT

900 East Pioneer Road to 12200 South Widening Project
Results
Draper, UT 84020

Southbluff Circle Drainage
Infrastructure
Post-Bid
Bluffdale, UT 84065

Highland Drive and Vestry Road Intersection Project
Results
Draper, UT

Reported 05/07/2022 12:00 AM
Project Title

Surplus Canal Drainage Project

Physical Address View project details and contacts
City, State (County) Salt Lake City, UT 84116   (Salt Lake County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $150,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The 1st part of the work is attaching a Downspout System to 2 existing bridge deck drain pipes in order to carry water into the Surplus Canal directly to the northeast. This 2nd item of work will include coordinating with Sean Martin of GWRR (801-367-1814, Rail Master) for a GWRR Flagger to aid in crossing over 2 sets of railroad tracks with materials and equipment to access the UDOT ROW where the Cleanout Box is to be installed. A CROSSING PERMIT has been obtained by UDOT from GWRR for this 2nd part of work so that equipment and materials can be transported across the railroad tracks.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents