Similar Projects
Y--Florida Ditch and Canal Lining
Design
$1,000,000 to $5,000,000 est. value
Durango, CO

3-Sided Precast Concrete Box Culvert
Infrastructure
Bidding
Montrose, CO

Flying Horse Detention Pond 1 Retrofit CM and Geotechnical Engineering Services
Infrastructure
Bidding
Colorado Springs, CO

Storm Water Cover Replacement Project
Post-Bid
Snowmass, CO 81615

Denver Water - Eleven Mile Reservoir Outflow Flume Replacement
Post-Bid
Denver, CO

Pmaa, Wray SFU - Pond Liners
Results
Less than $361,669 est. value
Wray, CO 80758

Fountain Creek Channel Stabilization at Riverside Project
Results
$2,000,000 to $3,000,000 est. value
Colorado Springs, CO

South Douglas Channel PDM Project
Infrastructure
Bidding
Colorado Springs, CO

HP and HDPE Storm Drainage Pipe for City Repair Projects
Term Contract
Post-Bid
Pueblo, CO

Chestnut Street to Eastman Park Drive Drainage Improvement Ph 1
Results
Less than $2,174,800 est. value
Windsor, CO 80550

OAAA, 1000, 082101 Utility Infrastructure at HAATS
Infrastructure
Bidding
$550,000 est. value
Gypsum, CO 81637

Goods for Chase Drain
Post-Bid
Castle Rock, CO 80104

Olde Stage Road Slope Stabilization, Wall Construction and Box Culvert Install
Results
CO

Quincy Reservoir Improvements, Package C - Aeration System
Infrastructure
Bidding
$1,300,000 to $1,500,000 est. value
Aurora, CO

Alley Water Main Replacement Project
Post-Bid
Cedaredge, CO

Reported 08/28/2021 12:00 AM
Project Title

Red Sandstone Creek Culvert Replacement

Physical Address View project details and contacts
City, State (County) Vail, CO   (Eagle County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work shall consist of what is shown on the plans, stated in the specifications, and summarized below: Ensure structure & precast footings are ordered & scheduled for installation Install traffic control signs and close National Forest System Road 700 Install erosion control measures on Red Sandstone Creek Install the stream-flow diversion system on Red Sandstone Creek Remove the existing culverts Excavate for the footing & structure Place precast footings ensuring grade and level foundation Backfilling the footings and install the streambanks and streambed Place the structure on the footings & secure with grout or receiving channel Remove stream-flow diversion system and return flow to the channel Install headwalls and wingwalls Backfill the structure per manufacturer’s requirements Place aggregate on road surface Install object markers Remove traffic control signs and barricades and re-open National Forest System Road 700 Seeding and final site work

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents