Last Updated | 11/15/2022 11:32 AM |
Project Title | Highway 16 / Neck Yoke Intersection - South Dakota Department of Transportation |
Physical Address | View project details and contacts |
City, State (County) | Rapid City, SD 57701 (Pennington County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Site Development |
Contracting Method | Competitive Bids |
Project Status | Construction start expected June 2025 |
Bids Due | View project details and contacts |
Estimated Value | $12,800,000 [brand] Estimate |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | At the 16/Neck Yoke Road intersection near Reptile Gardens, the corridor study advisory team is considering a reduced-conflict intersection. That is an intersection at which drivers entering the highway from a side street are required to make a right turn, and then have the opportunity to make a U-turn farther away from the intersection. The other option is to install traffic signals at the 16/Neck Yoke intersection. Both options are predicted to substantially reduce accident frequency at the intersection. The reduced-conflict intersection would keep traffic flowing along Highway 16 without stopping, and it would cost up to an estimated $5.4 million to implement. A signalized intersection would require through traffic to stop on Highway 16 and would cost up to an estimated $5.7 million. As of November 15, 2022, this project is in the conceptual phase. Information regarding a design firm and the general contractor selection timeline has not been disclosed. Although a firm timeline for construction has not been determined, construction is not expected to start prior to 2025. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |