Similar Projects
Aurora Water Cathodic Protection Installation
Infrastructure
Bidding
$400,000 est. value
Aurora, CO 80014

Filing 9 Wet Utilities at the Aurora Highlands
Infrastructure
Bidding
$900,000 est. value
Aurora, CO

Repair of 12 Inch Waterline - Piney creek Crossing at Saddle Rock Golf Course
Post-Bid
$380,000 est. value
Aurora, CO 80016

Riser Rings
Term Contract
Post-Bid
CO

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

On Call Construction Services - Urgent Water Pipeline Repair
Results
Englewood, CO

Z--Romo/239689, Moraine Park Campground and HQ Utilities-GAOA
Term Contract
Post-Bid
$10,000,000 est. value
Estes Park, CO 80517

2021 Water System Improvement - Central Package
Results
Aurora, CO 80040

2022 DCIP Water Main Replacement Project
Infrastructure
Post-Bid
$595,000 est. value
Littleton, CO

Large Valve Rehabilitation - Task 2
Results
$2,400,000 to $2,900,000 est. value
Aurora, CO 80040

Construction of the Yosemite Street Waterline Replacement
Infrastructure
Post-Bid
$300,000 est. value
Centennial, CO

60 Inch Gun Club Pipeline from East 6th Avenue to I-70 Phase 2
Alteration
Results
$7,400,000 to $7,700,000 est. value
Aurora, CO 80040

SWMWSD - 2022 DCIP Sanitary and Water Main Replacement Project
Infrastructure
Post-Bid
$510,000 est. value
Littleton, CO

2021 Capital Improvement Program Project
Infrastructure
Results
Centennial, CO

RFP Construction Manager - 2022-2023 Eastern Utility Extension, Zone 4 Waterline CM/GC Project
Infrastructure
Post-Bid
$400,000 est. value
Aurora, CO

Reported 06/02/2022 12:00 AM
Project Title

2022 Waterline Replacement

Physical Address View project details and contacts
City, State (County) Centennial, CO 80112   (Arapahoe County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $720,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Work generally consists of furnishing, delivering, constructing, installing, connecting, and testing approximately 8,700 lineal feet of 4 to 12-inch waterlines, fire hydrants, blowoff assemblies, service line reactivations, and existing waterline abandonment. Existing pipe material includes asbestos cement, PVC, and ductile iron. The Work includes extensive scheduling, permitting, and traffic control. The construction of all water main line work shall include providing and installing all necessary piping, fittings, valves, hydrants, and all other appurtenances to complete a fully functioning potable water distribution system and as shown or called for in the Contract Documents. All permitting, traffic control, potholing, excavating, asphalt and concrete removal and replacement, dewatering, backfilling, trench shoring, testing, surface restoration, site restoration and abandonments shall be performed by the Contractor as part of this Work.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents