Similar Projects
Rio Vista Elementary School Track and Field Project
Infrastructure
Bidding
$545,000 CJ est. value
Santa Clarita, CA 91351

RFP Design Build Services for the Lynwood Park: Storage Facility and Tennis Courts
New Construction, Infrastructure
Bidding
$1,300,000 CJ est. value
Lynwood, CA 90262

Concrete Repair Program - Phase XI
Infrastructure, Alteration
Post-Bid
$169,000 est. value
West Hollywood, CA 90069

Concrete Cutting Services
Term Contract
Post-Bid
zh, CA 93510

Construction of Concrete Improvements in Residential Streets
Alteration
Results
Cerritos, CA

Place Minor Concrete and Highway Plants
Alteration
Results
$3,850,000 est. value
Los Angeles, CA 90081

Park Walkway Repairs
Infrastructure
Bidding
$260,000 CJ est. value
Claremont, CA 91711

Downtown Visalia Streetlights and Paving Project
Infrastructure, Alteration
Post-Bid

Outdoor Gym Concrete
Alteration
Results
$100,000 est. value
Lancaster, CA 93536

2022-23 Thermoplastic Lane Striping Program
Infrastructure
Bidding
$170,000 CJ est. value
Santa Clarita, CA 91355

Annual Residential Street Rehabilitation Project (Phase 2B)
Term Contract
Post-Bid
Compton, CA 90221

Install Plants, Irrigation, and Prepare and Stain AC and Concrete
Alteration
Results
$830,000 est. value
City of Industry, CA 91714

Portland Cement Concrete Materials (As-Needed)
Term Contract
Post-Bid
$35,000 est. value
Palmdale, CA

Prepare and Stain Concrete
Alteration
Results
$640,000 est. value
Los Angeles, CA

RFQ Contractor - Belmont Beach and Aquatics Center
Demolition, New Construction, Infrastructure - 90,480 SF
Post-Bid
$70,000,000 CJ est. value
Long Beach, CA 90803

Last Updated 04/25/2023 12:22 PM
Project Title

Concrete Project - Fire Station No.1

Physical Address View project details and contacts
City, State (County) Downey, CA 90241   (Los Angeles County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Abandoned, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $30,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

1. Remove existing assumed 6" concrete and haul to legal dumpsite approximately 10,152 SF 2. Replace with 6-inch-thick concrete using a 3,000 PSI Concrete Mix with Fiber Mesh additive on native soil and a medium broom finish (Approximately 10,152 SF) 3. Install a 12" long, half-inch smooth dowel every 24" on center and epoxy with Simpson XP. Embed a minimum of 4 inches at existing concrete. 4. Scarify existing subgrade a minimum of 8". Water condition and recompact to 90% density. No pumping or deflection of subgrade. Proof roll with a Supper-10. 5. Soft cut joints a minimum depth of 1-1/2 inches. Soft cut joints should be spaced a maximum of 12 feet on center each way. Alternate Add: A. Replace additional section(s) with 6-inch-thick concrete using a 3,000 PSI Concrete Mix with Fiber Mesh additive on native soil and a medium broom finish (Approximately 840 SF) B. Install a 12" long, half-inch smooth dowel every 24" on center and epoxy with Simpson XP. Embed a minimum of 4 inches at existing concrete. C. Scarify existing subgrade a minimum of 8". Water condition and recompact to 90% density. No pumping or deflection of subgrade. Proof roll with a Supper-10. D. Soft cut joints a minimum depth of 1-1/2 inches. Soft cut joints should be spaced a maximum of 12 feet on center each way. Online Q&A Yes Q&A Deadline 04/18/2023 3:00 PM (PDT)

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents