Similar Projects
AutoZone #2929
New Construction - 6,000 SF
Conception
$500,000 to $1,000,000 est. value
Endicott, NY 13760

AutoZone #6872
New Construction
Conception
Westbury, NY 11590

Main Street Mixed Use
New Construction, Renovation
Design
Poughkeepsie, NY 12601

745 Broadway Mixed Use
New Construction - 100,093 SF
Design
$25,500,000 est. value
Albany, NY 12207

Todd Snyder #5508
Renovation
Bidding
New York, NY 10009

Todd Snyder #5508
Renovation
Bidding
New York, NY 10009

Wyldwyck Resort & Spa
New Construction, Build-Out - 54,677 SF
Post-Bid
Saugerties, NY 12477

Stoneleigh Place
New Construction - 15,000 SF
Post-Bid
$2,000,000 est. value
Rensselaer, NY 12144

Canalside Pocket Neighborhood Project - Developer Services
Results
$1,500,000 est. value
Canastota, NY 13032

147-151 Front Street Purchase and Redevelopment
Results
Vestal, NY 13850

Woodmont Hills
New Construction - 456,656 SF
Construction
Ramapo, NY 10974

Allentown II Apartments / Mixed Use
New Construction - 11,860 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Buffalo, NY 14202

Wurlitzer Flats
Renovation
Pending Verification
Buffalo, NY 14202

West 57th Street Redevelopment
New Construction, Renovation, Demolition - 194,434 SF
Pending Verification
$330,000,000 est. value
Manhattan, NY

Hylan Plaza Shopping Center Expansion Phase 1
New Construction - 3,400 SF
Conception
$500,000 to $1,000,000 CJ est. value
New York, NY

Reported 12/30/2021 12:00 AM
Project Title

Apple R046 - Restroom Upgrade - Shops At Nanuet

Physical Address View project details and contacts
City, State (County) Nanuet, NY 10954   (Rockland County)
Category(s) Commercial
Sub-Category(s) Retail
Contracting Method Competitive Bids.
Project Status Sub-Bidding, Construction Start Expected April 2022, Construction Completion Expected May 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from General Contractor
Owner View project details and contacts
Architect View project details and contacts
Description

This project is Union Only and Night time work. Total sq ft for project not available at this time.

Details

Retail, Renovation.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Loading Dock Equipment.
Division 12 - Furnishings, Casework, Rugs and Mats, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents