Similar Projects
24-Hour Fitness
Build-Out
Conception
Ledgewood, NJ 07852

Westfield Garden State Plaza
New Construction, Addition - 130,630 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Paramus, NJ 07652

Hilton Garden Inn
New Construction - 116,100 SF
Design
$50,000,000 est. value
Camden, NJ 08104

Best Western
Addition - 10,000 SF
Design
Williamstown, NJ 08094

New Field House Project at Randolph Township High School
New Construction, Demolition - 40,000 SF
Bidding
Randolph, NJ 07869

Residence Inn By Marriott
New Construction, Demolition
Sub-Bidding
East Brunswick, NJ 08816

Home2 Suites by Hilton
New Construction
Sub-Bidding
East Hanover, NJ 07936

Holiday Inn Express & Suites
New Construction - 11,967 SF
Post-Bid
$5,000,000 to $10,000,000 CJ est. value
Blackwood, NJ 08012

LA Fitness
New Construction, Addition, Demolition - 34,000 SF
Post-Bid
$10,000,000 est. value
Lawrence Towship, NJ 08648

Soccer Field Press Box Construction
Results
Glassboro, NJ

Gunnell Oval Improvements
Results
Kearny, NJ

American Dream at The Meadowlands
New Construction - 2,900,000 SF
Construction
$2,000,000,000 est. value
East Rutherford, NJ 07073

Comfort Inn & Suites Hotel
Addition - 63,854 SF
Construction
Newark, NJ 07114

Coastal Tower
Renovation
Pending Verification
$56,000,000 est. value
Atlantic City, NJ 08401

Fairfield Inn by Mariott Hotel
New Construction
Pending Verification
Union, NJ 07083

Last Updated 02/21/2019 09:07 AM
Project Title

Adventure Crossing - Phase I

Physical Address View project details and contacts
City, State (County) Jackson, NJ 08527   (Ocean County)
Category(s) Commercial, Entertainment/Recreation
Sub-Category(s) Athletic Facility, Hotel/Motel, Stadium
Contracting Method Bids by Invitation.
Project Status Design Development, Sitework Commenced January 2019, Construction Completion Expected first quarter 2021
Bids Due View project details and contacts
Estimated Value $500,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Phase I will include Clearing and Grading. It will consist of a 120,000sf indoor sports dome called Adventure Sports & Entertainment; two hotels, a 134-room Hilton Garden Inn and a 140-room SpringHill Suites by Marriott; eight outdoor sports fields; and a 100,000sf indoor recreational building with a trampoline park, indoor go-kart racing, and an area for video game competitions. The sports dome will be 89 feet high with five basketball courts, a full turf soccer field, a laser tag area, sports bar with a dining area, a retail sports shop, arcade, a hair salon and party and education rooms. A mezzanine level inside the dome will have space for other sports and activities, such as fencing and karate and training. Other phases will consist of It includes nine restaurants, including some with drive-thrus, and retail sites along Route 537 as well as a gas and convenience store. There's also plans for a third hotel, a golf facility, an expo center, a retail sports building, a facility with four to six hockey rinks, an outdoor stadium for sports events, such as football, cricket and lacrosse, and concerts. The plan also includes additional space for retail, apartments, and a brain research center focusing a multiple sclerosis with apartments for people with special needs.
Details ,, 220,000 SF - 1 Stadium, 120,000 SF New Construction, 1 Hotel/Motel, New Construction 134 Unit(s), 1 Hotel/Motel, New Construction 140 Unit(s), 1 Athletic Facility, 100,000 SF New Construction.
Division 01 - General Requirements, Construction Facilities.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete, Precast Structural Concrete, Precast Concrete Slabs, Site-Cast Concrete, Cast Decks and Underlayment, Concrete Cutting and Boring.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Decorative Metal.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Coiling Doors and Grilles, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Glazing, Mirrors, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting and Coating, Painting, Special Coatings.
Division 10 - Specialties, Signage, Partitions, Toilet, Bath, and Laundry Accessories, Safety Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Parking Control Equipment, Pedestrian Control Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Unit Kitchens, Office Equipment, Residential Equipment, Residential Appliances, Foodservice Equipment, Ice Machines, Cleaning and Disposal Equipment, Audio-Visual Equipment, Athletic and Recreational Equipment, Athletic Equipment, Interior Scoreboards, Play Field Equipment and Structures, Athletic Field Equipment, Exterior Scoreboards, Therapy Equipment.
Division 12 - Furnishings, Window Blinds, Curtains and Drapes, Casework, Furnishings and Accessories, Hospitality Furniture, Multiple Seating, Fixed Audience Seating, Stadium and Arena Seating.
Division 13 - Special Construction, Special Activity Rooms, Athletic Rooms, Athletic and Recreational Special Construction, Fabricated Engineered Structures.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Medium-Voltage Electrical Distribution, Facility Lightning Protection, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Call Management, Audio-Video Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment, Special Foundations and Load-Bearing Elements.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents