Similar Projects
Winghaven Boulevard Road Improvements Project
Infrastructure
Bidding
O Fallon, O'Fallon, MO 63368

Interstate Drive Phase IV
Infrastructure
Bidding
Saint Charles, MO

University Drive , Grobman Road and North Campus West Drive Paving
Infrastructure
Post-Bid

Parks Asphalt Paving
Infrastructure
Post-Bid
Foristell, MO 63348

Pavement Sealing and Striping of Justice Center and Water Treatment Facilities Parking Lots
Results
Saint Peters, MO

Great Oaks Turn Lane Addition
Infrastructure
Results
Wentzville, MO

Little Hills Expressway and Mel Wetter
Infrastructure
Bidding
Saint Charles, MO

Asphalt Removal and Replacement
Infrastructure
Post-Bid
Cottleville, MO

Hanley Road Reconstruction and Improvements
Infrastructure
Results
Dardenne Prairie, MO

Implementing Traffic Control Signaling Devices and Roadway Improvements
Infrastructure, Alteration
Post-Bid
Wentzville, MO

2021 Partial Depth Repairs
Infrastructure
Results
Saint Peters, MO

Muegge Road
New Construction, Infrastructure
Post-Bid
Saint Charles, MO 63302

Main Street Improvements (Oak Street to Saint Charles Street)
Infrastructure
Results
Cottleville, MO

Missouri Bluffs Park Asphalt Project
Infrastructure
Post-Bid
Lake Saint Louis, MO 63367

Mexico Road Resurfacing and Pedestrian Bridge Phase 3
New Construction, Infrastructure
Results
O Fallon, MO

Last Updated 10/16/2021 12:51 AM
Project Title

Pavement Preservation Treatment from I-64

Physical Address View project details and contacts
City, State (County) MO   (Saint Charles County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000 to $2,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

(1): Job J6S3303 Route 94 ST CHARLES County. Pavement preservation treatment from I-64 to Route 364, the total length of improvement being 3.514 miles (2): Job J6S3305 Route D ST CHARLES County. Preventative maintenance treatment from Route T to Route Z, the total length of improvement being 4.9 miles

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents