Similar Projects
Township & Fire Department Offices New Hall
New Construction
Conception
Walhalla, MI

Fire Stations 1 & 3 Remodels
Renovation
Conception
Auburn Hills, MI 48326

New Fire Station 4
New Construction - 11,800 SF
Design
Ann Arbor, MI 48104

Replace Two (2) Toilet Shower Buildings- Ludington State Park Beechwood Campground
Renovation
Design
Ludington, MI 49431

High School Soccer Shelter
New Construction
Bidding
Mason, MI 48854

DPD 9th Precinct Renovations
Renovation
Post-Bid
Detroit, MI 48213

Pontiac High School Concessions
Infrastructure
Post-Bid
Pontiac, MI 48342

Design Build of New Fire Stations 1 and 2
New Construction - 37,000 SF
Results
Highland, MI

Gateway Arch for Warren Corridor
Results
Dearborn, MI

Grayling Airfield-Construct Fire Station Addition
Addition
Construction
Grayling, MI 49739

Rosa Parks & Clairmount Revitalization
New Construction
Pending Verification
Detroit, MI 48200

Bay View Park Improvements
New Construction
Conception
$900,000 est. value
Alpena, MI 49707

Airway Fun Center: Spinning Coaster
New Construction
Design
Portage, MI 49002

2020 Bond Projects Bus Garage Office Remodeling Pine River Middle High School Announcers Booths LeRoy Elementary Pavilion
Renovation
Post-Bid
Le Roy, MI

Romulus Fire Station No 4 Building Structural and Facade Repairs
Results
Less than $125,470 est. value
Romulus, MI 48174

Last Updated 03/23/2022 11:44 PM
Project Title

Macomb County Sheriff'S Office Marine Patrol Boathouse

Physical Address View project details and contacts
City, State (County) Harrison Township, MI 48045   (Macomb County)
Category(s) Entertainment/Recreation, Government/Public
Sub-Category(s) Fire/Police Station, Misc. Recreational
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of: Complete demolition of the existing MC Sheriff’s Office Marine (4) boat well Patrol Boathouse in its entirety and construction of a new 12,516sf building with (5) boat well of masonry construction. The facility will consist of an administrative area, boat wells and a garage area, with a ICC500 storm shelter contained within the garage area. The administration area will have interior metal stud and drywall partitions, locker rooms, conference rooms, offices, kitchen, toilets and associated items. Roofs will consist of standing seam metal roofs with a flat BUR area for mechanical units. A generator will be included in the project. Site work consists of a new seawall, grade elevation revisions, new exterior docks, site remediation, setting up temporary facilities and maintaining services for the Sheriff’s Dept. on the DNR fisheries portion of the site. This includes relocating permanently (2) existing exterior docks form the current boathouse facility to the DNR fisheries area. Site work also includes removal of the existing above ground fueling station (salvage existing above ground tank), remediation of soil and install of a new fuel station with dual containment.

Details

Misc. Recreational, 12,516 SF New Construction, Fire/Police Station, New Construction.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents