Similar Projects
Special High Performance Cold Patch
Post-Bid
Erie, PA 16507

Entrance Road and Parking Lot Rehabilitation
Post-Bid
Erie, PA 16505

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Restoration of Street Cuts
Results
Erie, PA 16507

2020 ADA Curb Ramps Replacement Project
Post-Bid
Girard, PA 16417

Sidewalk Accessibility Project- Phase VIII
Results
Erie, PA

2020 Curb Ramps - II
Post-Bid
Erie, PA 16501

2020 Bituminous Seal Coat Project
Results
Harborcreek, PA 16421

Eastwood Drive and Delaware Avenue Paving Project
Post-Bid
North East, PA 16428

2020 Paving Project No. 1
Results
Harborcreek, PA 16421

2020 Curb Ramps - III
Post-Bid
Erie, PA 16501

PA 5: SR 4029 to PA 89
Results
$2,500,000 to $4,999,999 est. value
PA

Milling and Pavement Resurfacing of Eight (8) Borough Streets
Post-Bid
North East, PA

Single Bituminous Seal Coat
Results
Less than $70,595 est. value
Girard, PA 16417

North East Borough Handicapped Accessible Curb-Cut Ramps Project
Post-Bid
North East, PA

Last Updated 11/03/2021 08:16 AM
Project Title

West Front Street Extension

Physical Address View project details and contacts
City, State (County) Erie, PA 16507   (Erie County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Work includes the complete construction of a new roadway, pedestrian sidewalk, and bike path connecting Sassafras Street Extension at its western terminus and State Street at its eastern terminus. The roadway will be approximately 1,800' in length and will include two 11' wide travel lanes, 4' wide shoulders, an 8' wide concrete sidewalk along the north side and a 10' wide asphalt bike path along the south side. The Work will also include the construction of an asphalt paved parking area, precast modular retaining wall, railing, concrete curbs and sidewalks, lighting, landscaping, utility relocations, drainage, signage, and pavement markings.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Retaining Walls.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents